Geosyntec Consultants Logo

Environmental Management

Progressive Design Build and Stormwater P3 Project for the San Fernando Valley Green Streets Network

2026-05-26T09:00:19-06:00August 14th, 2020|

LA Sanitation and Environment (LASAN), in partnership with the Los Angeles Department of Water and Power (LADWP) and the California State Coastal Conservancy (SCC), authorized this project to capture and infiltrate stormwater to increase groundwater replenishment in the San Fernando Valley Basin and improve water quality downstream in the Los Angeles River.

Remedial Design and Construction Support of the Kendall Bay Sediment Remediation

2026-05-26T09:02:14-06:00May 26th, 2020|

Once home to the largest manufactured gas plant (MGP) in the southern hemisphere, Kendall Bay in Sydney, Australia is now surrounded by a residential neighborhood. The ultimate goal of the project is the effective cleanup of the impacted sediments at the bottom of the Bay.

Geosyntec implemented a Soil Management Plan for solid waste materials at transmission pole installation locations.

2026-05-26T09:13:08-06:00May 12th, 2020|

Worker safety assessment and preparation of a Soil Management Plan (SMP) for the excavation, management, and disposal of solid waste materials encountered at transmission rebuild pole locations within transmission line corridors located in the footprint of an old closed landfill: Gateway Landfill, 118th and 126th Avenue North in Clearwater, Florida.

Lockout/Tagout Procedures Inspections at Manufacturing Facility

2026-05-26T09:24:31-06:00March 4th, 2020|

The Occupational Safety and Health Administration (OSHA) cited the manufacturing facility for failing to conduct required lockout/tagout (LOTO) procedure annual inspections. LOTO procedures facilitate the proper shut off of equipment for maintenance or repair work.

Go to Top