Geosyntec Consultants Logo

USA

Contaminated Waste and Sediment Remediation at Bailey Superfund Site

2026-04-02T15:50:26-06:00October 24th, 2009|Tags: |

Originally part of a tidal marsh between a lake and river near the Texas/Louisiana border, the Bailey Superfund site is an "orphan site" resulting from past waste disposal operations. In the 1950s, two ponds were constructed as part of a fishing camp by dredging the marsh and using the sediments to form dikes. Additionally, a variety of wastes including industrial waste, refinery waste, tarry sludge, municipal waste, and debris were used as fill material for two of the dikes.

Development and Implementation of Comprehensive Dredged Material Management Solutions for an LNG Facility, Savannah, Georgia

2026-04-02T15:50:27-06:00October 24th, 2009|Tags: |

Southern LNG (SLNG), a subsidiary of El Paso Corporation, needed to reopen its liquefied natural gas (LNG) terminal and ship off-loading facility at Elba Island in Savannah Harbor, Georgia.

Remedial Investigation/Feasibility Study at the Berry’s Creek Superfund Site, Bergen County, New Jersey

2026-04-02T15:50:52-06:00October 24th, 2009|Tags: , , |

The Berry's Creek Study Area (BCSA) is a sediment "Mega Site" located in Bergen County, New Jersey, just across the Hudson River from New York City. It is an urban mix of industrial, commercial and residential properties. Berry's Creek itself is a tidal tributary of the Hackensack River, and its watershed encompasses approximately 12 square miles of marshes. The watershed has been found to contain elevated levels of contaminants of potential concern (COPCs) that have migrated to the watershed from various point and non-point sources. A group of potentially responsible parties (BCSA Cooperating PRP Group, or Group) has formed to conduct an RI/FS at the site. In 2007, the Group selected Geosyntec to lead a team to develop and implement the three-phased RI/FS. Ultimately, the results of the RI/FS will be used by U.S. EPA to prepare a Record of Decision.

Sediment Remediation Program at Terry and Dupree Creeks, Brunswick, Georgia

2026-04-02T15:51:21-06:00October 24th, 2009|

This Dredge Spoil Area/Outfall Ditch site is located in coastal Georgia and consists of four source areas, three disposal areas and an outfall ditch. The sources border Dupree Creek, Terry Creek and the Back River. From 1948 through 1980, toxaphene was produced at a plant in Brunswick. During this period, wastewater was disposed directly into Dupree Creek. Interpretation of a 1971 aerial photograph showed a plume in Dupree Creek emanating from the outfall ditch.The U.S. Army Corps of Engineers (USACE) Savannah District has been involved in dredging Terry and Dupree Creeks since 1938. Dredged spoils had been disposed in three principal areas. The sediments dredged from Terry and Dupree Creeks were determined to be contaminated with toxaphene. The largest disposal area used by the USACE during this time was about 17 acres. The impoundment construction was such that sediment and water were disposed directly into the spoil area, and as the solids settled out of the dredge slurry, water was allowed to drain out of three weirs and back into Terry and Dupree Creeks.

Feasibility Evaluation of a Subaqueous Cap for Disposed Dredged Material, Palos Verdes Peninsula, California

2026-04-02T15:50:53-06:00October 24th, 2009|Tags: , , |

U.S. EPA had proposed placing a subaqueous cap over a 37 square mile of sea floor seaward of a major wastewater ocean outfall along the Palos Verdes peninsula in Los Angeles County, California. The intent of the subaqueous cap was to contain DDT and PCB impacted ocean floor sediments and reduce exposure to the sediments by benthic organisms. The water depth in the area of the proposed cap ranges from about 130 to 170 feet. This area is also subject to significant ocean currents and is seismically active (Palos Verdes Fault Zone). The proposed cap was to be placed by dumping hydraulically dredged sand and/or crushed rock from hopper barges. Geosyntec was retained by a group of Potentially Responsible Parties (PRPs) to be a member of a multi-disciplinary team to evaluate the feasibility of U.S. EPA's proposed capping remedy. Our specific role was to evaluate the geotechnical feasibility of the proposed plan.

Evaluation of the Ecological Impact from MTBE on the Seal Beach National Wildlife Refuge at a Naval Weapons Station, Seal Beach, California

2026-04-06T13:05:03-06:00October 24th, 2009|Tags: |

The Seal Beach Naval Weapons Station provides weapons storage, loading, maintenance, assessment, and support to ships and submarines of the U.S. Pacific Fleet. Fully contained within the Station is the Seal Beach National Wildlife Refuge (SBNWR), a 400+ acre wetland and estuary habitat. Site 14 is a former underground storage tank (UST) site at the Naval Weapons Station where leaks and spills led to subsurface contamination by compounds associated with gasoline such as methyl tertiary butyl ether, or MTBE, a fuel oxygenate. Benzene, toluene, ethylbenzene, and xylene (BTEX), which are also components of the gasoline stored at the site, were also detected in the groundwater and creating a potential threat to SBNWR.An existing remediation plan was to use Oxygen Releasing Compounds (ORC) in approximately 180 injection points at Site 14 to clean up the MTBE and BTEX compounds. However, the use of ORC to enhance the microbial degradation of these existing hydrocarbons would have been hampered by the intrinsic high oxygen demand of the site soils, significantly increasing the remediation costs. Before implementing the ORC remediation approach, the Navy requested that Geosyntec complete an ecological risk screening (ERS), field investigation, microcosm study, geochemical evaluation, remedial site evaluation (RSE), and a corrective action plan (CAP) to deal with the contaminants of concern.

Bolsa Chica Wetlands Restoration Design, Huntington Beach, California

2026-04-06T11:35:54-06:00October 24th, 2009|Tags: , , |

The Bolsa Chica site is approximately 1,100 acres of degraded coastal wetland that has been affected by oil field activities for 80 years. After years of controversial development proposals, the site was purchased and set aside for restoration as an off set for construction activities in Los Angeles and Long Beach harbors. The California Coastal Conservancy and other agencies have oversight of the planning and design of the restoration at the Bolsa Chica Wetlands.

Remedial Design/Remedial Action under CERCLA and Soil and Groundwater Remediation at a Former Manufacturing Facility

2026-04-02T15:50:52-06:00October 24th, 2009|

The Client retained Geosyntec to lead the implementation of a Remedial Design/Remedial Action (RD/RA) for a Superfund site at the location of a former manufacturing operation. Primary chemicals of concern at the site were polychlorinated biphenyl (PCB) in soil and perchloroethylene (PCE) in groundwater. The work was performed to meet the requirements of a Record of Decision, under the review and approval of the U.S. EPA Region IV and the North Carolina Department of Natural Resources (NCDNR) Division of Waste Management.

Ecological Risk Assessment and RCRA Facility Investigation at a Solid Waste Management Facility – NASA Kennedy Space Center

2026-04-02T15:51:21-06:00October 24th, 2009|Tags: |

Geosyntec is providing environmental consulting services to the National Aeronautics and Space Administration (NASA), Kennedy Space Center (KSC) under an Indefinite Delivery Order/Indefinite Quantity (ID/IQ) contract. The services provided are in support of KSC's RCRA Corrective Action Program. The Orsino Storage Yard is a 3-acre facility located in the KSC industrial area. The site was used historically for the storage and staging of electrical equipment, such as transformers, cables, control panels, telephone poles, etc. , and was designated as Solid Waste Management Unit #4 at KSC. Contaminants of concern at the site included pesticides, polychlorinated biphenyls (PCBs), and metals in canal sediment, PCBs in soils, and volatile organic compounds (VOCs) in groundwater.

Karst Hydrology Investigation and Site Preparation for Redevelopment at a Former Metalworking and Foundry Operation

2026-04-02T15:51:21-06:00October 24th, 2009|Tags: |

Metalworking and foundry operations have been the principal activities conducted on-site from at least 1917 until 2005. Groundwater investigations have shown that groundwater on-site and immediately off-site is contaminated with chlorinated volatile organic compounds (CVOCs), primarily trichloroethene (TCE), tetrachloroethene (PCE), and 1,1,1-trichloroethane (TCA). Clayey and silty regolith and fractured and karstic dolomite bedrock underlay the site. GPI Interim retained Geosyntec to 1) develop a comprehensive understanding of site conditions that influence the fate and transport of contaminants at the site; 2) establish a basis for evaluating practical management controls and assessing the appropriate final disposition of the site, and 3) prepare the site for sale to a new owner for the purpose of redevelopment.

Go to Top