USA

Geotechnical Engineering Support for Wolf Creek Dam Deep Barrier Wall Construction

2026-07-20T10:46:24-06:00July 20th, 2026|

The Wolf Creek Dam is located on the Cumberland River in the western part of Russell County, Kentucky. The dam provides hydroelectric power generation, flood management, water storage for year-round navigation, and water recreation. In addition, the dam serves as part of U.S. Highway 127.

Evaluating and Practicing Innovative Conservation (EPIC) Project Missouri Innovative Nutrient Trading (MINT) Project

2026-10-08T12:48:56-06:00July 20th, 2026|

The U.S. Department of Agriculture Natural Resources Conservation Service (NRCS) and Missouri NRCS offices awarded Conservation Innovation Grants to the Environmental Resources Coalition and Geosyntec Consultants for two projects aimed at introducing water quality trading concepts in Missouri.

Technical Support for a Construction Claim Regarding Historic Fill

2026-07-20T09:26:02-06:00July 20th, 2026|

During construction of the massive underground highway project in Boston known as the "Big Dig," the Massachusetts Transportation Authority (MTA) entered into an agreement with the City of Quincy to dispose of "historic fill" excavated from the project.

Interactive GIS Application Development and Implementation for Chickamauga Lock Grouting Activities

2026-07-20T08:51:51-06:00July 20th, 2026|

The new 110' x 600' Chickamauga Lock is being designed and constructed by the Nashville District, U.S. Army Corps of Engineers (USACE). The Judy Company (JC) has been contracted to construct a barrier wall consisting of an angled grout curtain.

DNAPL Investigation in Fractured Bedrock and In Situ Chemical Oxidation for Remediation of Trichloroethene

2026-07-20T08:39:03-06:00July 20th, 2026|

Since 1956, the Tenneco Automotive facility has been producing automotive components at the project location near Hartwell, Georgia. The site is underlain by fractured bedrock and highly anisotropic groundwater flows due to subsurface lineaments.

Decommissioning and Demolition Plans and Mercury Containment Removal at a Former Chlor-alkali Manufacturing Plant

2026-07-20T08:34:55-06:00July 20th, 2026|

The LCP Holtrachem Site is a former chlor-alkali manufacturing facility which used the mercury cell process, located along the Cape Fear River near the coast of North Carolina. This ecologically sensitive area serves as a fishery, fisheries nursery area, and spawning area for the endangered short nosed sturgeon.

Site Investigation and Remediation of NAPL and Sampling and Analysis Plan Development for a Former Creosote Storage Facility

2026-07-20T08:09:54-06:00July 20th, 2026|

The Bernuth-Lembcke site is a 3.5-acre parcel of land situated in an industrial setting near the Savannah River in Savannah, Georgia. The site PRPs include Norfolk Southern Railway (NS) and Honeywell.

CAP Approach to Site and Stream Remediation and Reduction of Hydrocarbons in Fractured Bedrock Aquifer at a Former Manufactured Gas Plant

2026-07-20T07:40:35-06:00July 20th, 2026|

At the Colonial Pipeline Gaffney booster station site, the overburden and bedrock aquifers beneath the site have been impacted with dissolved petroleum hydrocarbons associated with historical operations and spills at the facility. A methyl tertiary butyl ether (MTBE) and benzene plume had migrated to both the north and the south part of the site because of the groundwater divide near the spill area.