Geosyntec Consultants Logo

Ohio

Moorman Yard Sanitary Pump Station Replacement

2026-05-28T09:09:59-06:00August 13th, 2025|

The Norfolk Southern Railway Corporation, Inc. (NSRC) Moorman Yard is a major rail classification yard. Sanitary waste at the site is collected and treated before being discharged off-site via stormwater collection swales. Due to new expansion plans and desires to avoid potential discharge limit issues, NSRC needed to shift away from on-site treatment and transition to the local publicly owned treatment works (POTW) for handling the sanitary waste flows from the site.

Integrated Solid Waste Operations Review and Assessment

2026-04-02T16:44:03-06:00March 18th, 2019|

The Solid Waste Authority of Central Ohio (SWACO) manages over a million tons of solid waste annually through an integrated regional network of waste processing, transfer, and disposal facilities in the Columbus, Ohio region. Following a major turnover in executive management, SWACO was interested in a top-to-bottom review of their organization so that they could assure their stakeholders that the organization could continue its mission well into the future. In support of this goal, SWACO retained Geosyntec to provide an independent assessment of their solid waste operations, financial planning, staff organization and maintenance operations. This included a review of their landfill and transfer station operations, landfill gas (LFG) system operations, heavy equipment maintenance, capital projects planning, financial reporting, in-house engineering support, and overall organization of their operations.

Bolivar Dam Seepage Barrier Wall Construction Data Management

2026-05-26T08:41:10-06:00November 28th, 2017|

Geosyntec acted as the Data Manager of Record for this barrier wall installation. Work included maintaining a geospatial database to compile all project data. Modules included tools to automatically analyse verticality and overlap of excavations from Koden data and generate USACE-approved reports verifying construction.Bolivar Dam on Sandy Creek of the Tuscarawas River in Bolivar, Ohio is a dry dam consisting of two levees within the Bolivar Dam reservoir.

Design and Permitting for Closure of a Fly Ash Reservoir High Hazard Dam Modification

2026-04-02T15:28:17-06:00July 24th, 2015|Tags: , |

Geosyntec's client, a power plant in Ohio, generates electricity from two, 1,300-MW, coal-fired units. In anticipation of upcoming federal coal combustion residuals (CCR) regulations, the client decided to initiate closure design for a 300-acre fly ash pond. The site also features a high hazard dam. Acid mine drainage (AMD) from around the reservoir reduces the pH of the water and is currently treated in the reservoir.

Design and Permitting of a Flue Gas Desulfurization Residuals Waste Landfill Over an Existing Ash Pond

2026-04-02T15:28:20-06:00July 23rd, 2015|Tags: , , |

An American Electric Power plant in Ohio generates electricity from two, 1,300-MW, coal-fired units. The client's objective for the project was to have additional capacity for residual waste disposal available at a reasonable construction cost before the existing coal ash residual waste landfill (RWL) reached capacity in approximately 18 months.

Onsite Disposal Facility for Low-level Radioactive Wastes from Fernald D&D Program

2026-04-02T15:36:43-06:00May 30th, 2014|Tags: , , , , , |

The Feed Production Center at the Fernald site was a uranium processing plant under the Atomic Energy Commission and operated by U.S. Department of Energy (DOE) until 1989. Over its history, the plant refined and machined 500 million pounds of uranium metals.

Analysis of Subsurface Vapor Intrusion to Indoor Air and Background Conditions near a Former Refinery in Ohio

2026-04-02T15:50:53-06:00October 29th, 2009|Tags: |

Trihydro Corporation, a prime contractor to a major integrated petroleum refining company with historic operations across the United States, has responsibility for the remediation of groundwater impacted by hydrocarbons at a site in Ohio. One of the key issues to be resolved as the groundwater remediation program moved forward was the potential for subsurface vapor intrusion into indoor air in a residential neighborhood adjacent to the site. Light, non-aqueous phase liquid (LNAPL) hydrocarbons from the former refinery operations were present at one time beneath a portion of the community. The U.S. EPA Region 5 required an assessment of the potential for vapor intrusion, and Trihydro wished to ensure that the sampling and analysis program would provide the best practicable data quality. Background concentrations of some gasoline constituents (such as benzene) can exceed risk-based target concentrations for inhalation exposures, so it was clear from the beginning of the project that a forensic analysis could be required to ascertain the source of certain vapors. Resolution of any off-site vapor intrusion issues is part of long-term strategy for redevelopment of the original refinery site for recreational, commercial, and/or manufacturing uses.

Geotechnical Investigation and Landslide Stabilization at Vandale Junkyard Superfund Site

2026-06-16T14:30:23-06:00October 23rd, 2009|Tags: |

The Vandale Junkyard NPL site was operated as a permitted junkyard for over 40 years, and was included on the NPL in 1986. After extensive site investigation activities conducted by others, U.S. EPA Region 5 issued the Record of Decision (ROD) in 1994 calling for a non-time critical remedy involving capping. During the junkyard's active life, waste in one area of the site was ignited at the top of a 150-ft high slope, which resulted in a solid waste residue (SWR) consisting of glass, metal debris, and ash mixed with soil. The SWR was pushed down the slope over the natural colluvium present over bedrock. The planned remedy developed by others for the site included placement of stockpiled waste from other areas of the site over the SWR and a final cover system installed over the placed waste materials. At the onset of remedy implementation, it was discovered that the hillside was geologically unstable and the surficial SWR and colluvial soil were actively creeping downslope. The EPA required the site PRP group to quickly investigate the cause of the geologic instability and to develop a revised site design to stabilize the slope and achieve the environmental remedial action objectives. The PRPs retained Geosyntec to undertake this scope of work.

Field-Scale Verification of Engineering Properties for Sluiced Fly Ash

2026-04-06T13:04:26-06:00October 20th, 2009|Tags: |

American Electrical Power (AEP) is developing a 348-acre residual waste landfill (RWL) located over portions of an inactive fly ash reservoir (FAR) and an area of historic mine spoil deposits near Brilliant, Ohio. Geosyntec's design required the sequential development of the RWL with a preloading period. To develop a better understanding of the required preloading period, Geosyntec designed and implemented a monitored preload fill (MPF) test program to evaluate the specific in-place compression and drainage characteristics of the fly ash in the FAR.

Go to Top