Georgia

DNAPL Investigation in Fractured Bedrock and In Situ Chemical Oxidation for Remediation of Trichloroethene

2026-07-20T08:39:03-06:00July 20th, 2026|

Since 1956, the Tenneco Automotive facility has been producing automotive components at the project location near Hartwell, Georgia. The site is underlain by fractured bedrock and highly anisotropic groundwater flows due to subsurface lineaments.

Site Investigation and Remediation of NAPL and Sampling and Analysis Plan Development for a Former Creosote Storage Facility

2026-07-20T08:09:54-06:00July 20th, 2026|

The Bernuth-Lembcke site is a 3.5-acre parcel of land situated in an industrial setting near the Savannah River in Savannah, Georgia. The site PRPs include Norfolk Southern Railway (NS) and Honeywell.

Hartsfield Jackson International Airport Plane Train Tunnel West Extension Surface Instrumentation Monitoring

2026-05-25T14:27:08-06:00November 11th, 2024|

Clark-Atkinson-Technique Joint Venture has designed and is constructing a 900-foot tunnel extension of the existing Plane Train automated people-mover system at the Hartsfield-Jackson Atlanta International Airport in Atlanta, Georgia. The project entailed constructing a vertical shaft and performing tunneling work beneath both the existing terminal and the MARTA and SkyTrain systems.

Jekyll Island Oceanfront Shoreline Rehabilitation, Jekyll Island, Georgia

2026-04-02T16:12:10-06:00September 15th, 2021|

ATM, a Geosyntec Company, provided full-service planning, public outreach, engineering, design, permitting, bidding, and construction administration support on the rehabilitation of 10,000 linear feet of the northern portion of the Jekyll Island oceanfront shoreline.

Treatability Testing, Remedial Design & Remedial Action Former Camilla Wood Preserving

2026-04-02T16:12:08-06:00January 6th, 2021|

The wood preserving facilities at the 54-acre Camilla Wood Preserving Superfund site were active from 1947 to 1991. Facility operations resulted in soil and groundwater contamination. The remedy for the Site included a barrier wall to contain creosote DNAPL and in situ remediation to treat dissolved phase contamination outside the barrier wall.

AGE Biomass Renewable Energy Plant

2026-05-26T08:30:51-06:00October 27th, 2020|

DCO Energy, LLC (DCO), was the design-build contractor for the $200M, 50 MW AGE Biomass Renewable Energy Plant in Albany, Georgia, a project jointly developed by Constellation Energy (Exelon) and Proctor and Gamble Co., Inc. The original foundation design by a local consultant had resulted in a very conservative working pile resistance and a significant number of costly battered piles. Therefore, new steel H-pile foundations were proposed.

Investigations into the Presence of Emerging Contaminants at an Active Military Installation

2026-05-26T09:25:11-06:00March 2nd, 2020|

A pond at Robins Air Force Base (AFB) was used to contain runoff from aircraft maintenance hangars in the event of a release of aqueous film forming foam (AFFF), used as part of firefighting or training activities.