Geosyntec Consultants Logo

San Francisco Bay Area

Reasonable Assurance Analysis: Guidance and Source Control Load Reduction Accounting

2026-05-26T08:57:52-06:00August 14th, 2020|

Bay Area Municipal Regional Permit (MRP) Provision C.3.j required the Permittees to develop a Green Infrastructure (GI) Plan for inclusion in their Annual Report. MRP Provisions C.11.c and C.12.c require the Permittees to prepare a Reasonable Assurance Analysis (RAA) for inclusion in the their Annual Report that quantitatively demonstrates that mercury load reductions of at least 10 kg/yr and PCBs load reductions of at least 3 kg/yr will be achieved by 2040 through implementation of GI throughout the MRP area.

Sea Level Rise Guidance in the San Francisco Bay Area, California

2026-04-14T08:26:43-06:00September 12th, 2018|

Geosyntec is providing a variety of engineering and permitting services at an oil refinery in the San Francisco Bay Area. The Regional Water Quality Control Board (RWQCB) requires formal engineering closure plans for inactive waste management units (WMUs) at the refinery facility.

Go to Top