Reasonable Assurance Analysis: Guidance and Source Control Load Reduction Accounting
Bay Area Municipal Regional Permit (MRP) Provision C.3.j required the Permittees to develop a Green Infrastructure (GI) Plan for inclusion in their Annual Report. MRP Provisions C.11.c and C.12.c require the Permittees to prepare a Reasonable Assurance Analysis (RAA) for inclusion in the their Annual Report that quantitatively demonstrates that mercury load reductions of at least 10 kg/yr and PCBs load reductions of at least 3 kg/yr will be achieved by 2040 through implementation of GI throughout the MRP area.