Environmental Compliance for an Airport Equipment Manufacturer
This project addressed several environmental gaps identified during ownership transition at a facility that manufactures aviation ground equipment. The facility needed a spill control, prevention, and countermeasure (SPCC) plan, a stormwater pollution prevention plan (SWP3), and a different air permit. Potential gaps in environmental reports were also noted. Geosyntec was engaged to close the identified gaps and maintain environmental compliance.


