Geosyntec Consultants Logo

Houston

CSM Development and Remedial Design for Contaminated Soils, Sediments, and Groundwater, Greens Bayou, Houston, Texas

2026-04-02T15:50:53-06:00October 27th, 2009|Tags: , , , , |

Starting in the early 1950s and continuing over a period of several decades, arsenicals and organochlorine pesticides, including DDT and Lindane, and production raw materials and intermediates, were released into soil, groundwater, and surface water adjacent to Greens Bayou, a part of the Houston Ship Channel system. These contaminants were transported into Greens Bayou and local tributaries to the bayou via industrial discharges, surface water runoff, and groundwater discharge and upwelling. Geosyntec was retained by counsel to the Port of Houston Authority (PHA) to evaluate remediation strategies and develop remediation cost estimates to mitigate the impacts associated with this contamination loading to Greens Bayou and the tributary waterways, the most significant tributary being a large Harris County Flood Control Channel (HCFCC).

Temporary Excavation Design for expansion of Memorial Hermann Heart and Vascular Institute

2026-04-06T13:01:25-06:00October 27th, 2009|Tags: |

As part of an expansion to the Memorial Hermann Heart and Vascular Institute's (MHHVI) facilities on the Texas Medical Center campus in Houston, Texas, Hayward Baker, Inc. was selected to construct a new below ground parking structure immediately adjacent to an existing structure. The new facility required the excavation of approximately 42,000 sq. ft. to a depth ranging from 18 to 30 ft. below ground surface. Our client, Hayward Baker, was hired by the owner under a design-build approach to provide a temporary excavation support system for this project. Geosyntec was selected by Hayward Baker to prepare and certify the support system design. Our client's goals were to (i) design a system that did not require alteration of the parking facility design or construction methodology and (ii) install the excavation support system without disrupting hospital operations or adjacent utility systems.

Comprehensive Remediation and Construction for LNAPL Plume Remediation

2026-04-02T15:50:52-06:00October 24th, 2009|

In 2002, the Federal Reserve Bank broke ground on a four-story, 280,000-square-foot facility on the former Jefferson Davis Memorial Hospital site in Houston, scheduled for completion in 2005. A gasoline plume from an off-site City of Houston vehicle maintenance facility threatened to disrupt construction, as previously installed recovery systems were still in place.

Go to Top