Design and Implementation of Nickel IWW Treatment to Reduce Groundwater Impact
Geosyntec was retained by Progress Energy Florida, now Duke Energy, to prepare a corrective action plan to address nickel impacts to groundwater at the Anclote Power Plant. Excess nickel concentrations were detected in the facility's industrial wastewater (IWW) as a result of air-heater washes. The oil-fired boiler at the plant would soon be converted to natural gas, so only a limited number of air-heater washes would be performed in the future.

