Geosyntec Consultants Logo

FL

Remediation and Other Environmental Services at the Northside Generating Station

2026-04-02T16:51:11-06:00June 28th, 2021|

JEA’s Northside Generating Station has supplied electrical power to the City of Jacksonville since the 1960s and currently operates three boilers and four combustion turbine generators. Prior Resource Conservation and Recovery Act (RCRA) investigations detected impacts to groundwater, surface water, soil, and sediments at multiple solid waste disposal areas.

Remediation and Other Environmental Services at the Northside Generating Station

2026-09-24T10:16:16-06:00January 21st, 2021|

JEA’s Northside Generating Station has supplied electrical power to the City of Jacksonville since the 1960s and currently operates three boilers and four combustion turbine generators. Prior Resource Conservation and Recovery Act (RCRA) investigations detected impacts to groundwater, surface water, soil, and sediments at multiple solid waste disposal areas. Contaminants of concern included arsenic, nickel, and vanadium. JEA selected Geosyntec to provide corrective measures and related environmental services in response to a RCRA Consent Order.

Herbert Hoover Dike Rehabilitation – “WallTracker”

2026-05-26T08:59:53-06:00November 16th, 2017|

Geosyntec developed the WallTracker system to allow USACE and the Contractor immediate and interactive access to field and laboratory data collected during a large-scale diaphragm-wall installation.The Herbert Hoover Dike (HHD) rehabilitation project is designed to stabilize and secure the aging dike from potentially damaging severe weather events, and protect the numerous residents and businesses on the southeastern rim of Lake Okeechobee.

Go to Top