Storm Tank Optimization for a Sewage Pumping Station in England

Storm Tank Optimization for a Sewage Pumping Station in England

Client

4D Delivery Ltd on Behalf of Southern Water Portsmouth

Services Provided

.

A diagram shows a fish tank system with labeled tanks, inlets, outlets, dwarf walls, and dividing walls. Below are three views labeled Low, Mid, and High Level Openings, with highlighted water flow patterns.

Location

England

Project Practice Areas

Water & Wastewater, Waste Management

Type of Facility

Wastewater Treatment

Project Specifics

During periods of heavy rainfall, Eastney Sewage Pumping Station diverts flow to the Fort Cumberland Storm Tank.  During the first flush, the solids content of the flow is higher than normal, which overloads 6mm band screens located upstream of the storm tank. In order to help separate a greater quantity of solids from the flow and enable the screens to work as intended, it was proposed that the storm tank receives the flow and provides a residence time for solids to settle.

Geosyntec Scope of Services

The concept involved the storm tank being divided into four tanks, where the flow would pass from one tank to the other through openings in the dividing walls.

To determine the optimum configuration, three opening arrangements within the dividing walls were investigated:

  • Low level openings (0.6 m from the tank floor)
  • Medium level openings (approximately 1.5m from the tank floor)
  • High level openings (approximately 2.5m from the tank floor)

Transient calculations approximating a worst case storm event were undertaken. To represent the solids, the transport of ten particle size groups were solved with five size classes representing grit particles, four representing tissue, and one representing floatable material.

It was found that the distribution of solids within the tank was similar for the “low” and “medium” level openings. The high level openings were found to be most effective, as these retained a greater percentage of the solids in the first two tanks. It was also found that with dip plates located on the upstream side of the openings, almost 100% of floatable material was retained within the first two tanks, compared to approximately 45% without dip plates.

Notable Accomplishments

The use of computational fluid dynamics (CFD) enabled the storm tank concept to be assessed much faster and at a lower expense (compared to the commissioning physical models).