Solid, Industrial, and Hazardous Waste Disposal Facilities

2026-04-21T07:59:21-06:00March 28th, 2014|Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , |

Geosyntec is a recognized leader in helping our clients achieve safe, secure containment of their regulated wastes requiring land disposal.  We provide engineering and related services for siting, permitting, design, construction management/quality assurance, environmental monitoring, and closure/post-closure care. We are experienced in the design of: Municipal solid waste and construction and demolition debris disposal facilities Coal combustion residuals disposal facilities Industrial waste disposal facilities Hazardous waste disposal facilities The applied research of our leading practitioners for U.S. EPA, DOE, and industry associations has defined the state-of-the-practice for more than 30 years.  As a result, Geosyntec is often first-to-field with emerging technologies related to the secure, safe containment of our nation’s solid, industrial, and hazardous wastes.  Many of the waste containment system design methodologies that we pioneered in the 1980s, 1990s, and 2000s are today the standards of practice in the field. Using experience gained on projects at more than 400 facilities nationwide, we develop practical approaches to design and construction challenges associated with liner and cover systems, leachate and gas management, construction/waste filling/closure sequencing, and geotechnical and earthquake stability. We apply advanced concepts in geotechnical engineering and ground improvement methods to design foundations for sites that have poor structural characteristics or significant geological hazards. We have also pioneered the use of earth retention systems in the design of landfills to maximize airspace volume within limited property boundaries. We are working with our clients to develop approaches for the next generation of integrated waste management practices.  Emerging processes that take advantage of currently available technologies include renewable energy development, enhanced waste separation and processing, enhanced waste degradation through active biological processes, and resource recovery. Integration of conventional and emerging practices is often necessary to meet the complex demands of a community. We work with clients to develop strategic and tactical plans to solve their future MSW management challenges and meet cost, compliance, and service objectives.

Seismic Hazard Evaluation and Ground Motion Studies

2026-04-23T12:27:44-06:00March 27th, 2014|Tags: , , , , , , , , , , , , , , , , , |

Geosyntec has played a leading role in the development of state-of-the-art liquefaction and seismic analyses for more than 20 years and has pioneered designing economical structures that safely resist the loads caused by earthquakes. Geosyntec is recognized nationally and internationally for our capability to analyze the liquefaction potential of dam embankments and their foundations, as well as to assess the impact of liquefaction on bridges, buildings, and other structures. Geosyntec has performed liquefaction evaluations for hundreds of projects, including assessment of the consequences of liquefaction and development of solutions to mitigate concerns. These solutions have included ground improvement designs followed by testing during construction to verify that design objectives were met.

Geotechnical and Geostructural Engineering

2026-04-23T11:55:26-06:00March 27th, 2014|Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |

Geosyntec provides nationally recognized expertise and specialized geotechnical and geological engineering (geoengineering) services to evaluate and improve the design and construction engineering properties of soil and rock foundations. Our geoengineering specialists form one of the leading practices in the world. They are recognized for their ability to develop practical guidance, and efficient designs conducive to aggressive construction schedules commonly imposed by project economics. Our geoengineering practice focuses on difficult and challenging sites where the development of dependable, cost-effective foundations, and other geostructural solutions are critical to the success of the project. Our practitioners accomplish this by establishing a thorough understanding of the project site, developing a technical framework for the project, and incorporating the critical, non-engineering drivers such as schedule and project economics into the early stages of our planning. Our geoengineering professionals have responded to the challenges of increasingly unfavorable site conditions by developing and applying sophisticated approaches to investigate and characterize sites; analyzing foundation behavior; altering the engineering characteristics of the soil and rock at a specific site through soil and rock improvement; and environmentally remediating sites. We implement these approaches so foundations and other subsurface structures can be constructed safely, adequately support the built environment, and withstand potential geohazards. Our geotechnical practitioners are fully familiar and experienced with the practical application of these tools. For example, when a client needed to develop a critical structure near Wilmington Harbor in Delaware, the client turned to Geosyntec to geotechnically engineer a practical, cost-effective solution. Our team developed an innovative foundation design and construction methodology for very soft and compressible foundation materials that included wick drains, embankment pre-loading, and mechanically stabilized earthen walls. Our design saved the client nearly $100 million when compared to more traditional approaches proposed by others. Our geoengineering practitioners distinguish themselves by rapid development of an appropriate understanding of the geologic and environmental history of a site, and using this knowledge to screen potential ground improvement and foundation technologies (wick drains, deep soil mixing, deep dynamic compaction, vibro-replacement, and surcharging) to identify the more dependable and cost-effective approaches. These screening-level studies become a basis for gathering optimized geotechnical information based on carefully considered analyses tempered with practical, hands-on experience sufficient to not only characterize the site, but also design dependable foundations. These attributes have been particularly beneficial to our petroleum and chemical industry clients who are currently undertaking large-scale capital projects in undeveloped areas. For example, Geosyntec is working with oil and gas interests on foundation design, offshore reclamation, and underwater slope stability issues related to the development of a liquefied natural gas trans-shipment facility on the coast of southwestern Africa. Our senior practitioners have authored technical design and construction manuals for the Federal Highway Administration focusing on foundation support systems, earth retaining systems, and earthquake engineering. Geosyntec provides lead, geotechnical training instructors for the National Highway Institute and the American Society of Civil Engineers (ASCE). We also provide training to state departments of transportation, contractors, and consultants for state-of-the-practice design applications. Our staff members are active contributors and developers of the American Association of State Highway and Transportation Officials Load and Resistance Factor Design Specifications for bridge substructures including foundations and retaining wall systems. Several of our practitioners have received ASCE's highest awards for advancing the state of the practice in geoengineering.  

Radiological Waste Management and Disposal Facilities

2026-06-03T11:14:05-06:00March 27th, 2014|Tags: , , , , , , , , , , , , , , , , , , , , , , |

Geosyntec's practitioners work with regulators and stakeholders to develop solutions for a range of radiological challenges, including waste management and disposal, waste packaging and transportation, facility decontamination and decommissioning (D&D), and environmental restoration for government and private clients. Our established credibility with regulators contributes to securing the approvals needed to move demanding projects forward in a timely manner. Engineering and designing containment facilities for the safe, long-term disposal of radiological and mixed (radiological and hazardous) wastes challenges the norms in terms of technology demonstration, design life, and material performance. The extremely long half-lives of many radionuclides present in these wastes mean that the radiological characteristics of these materials will be persistent over long periods of time. This requires that they be disposed and managed in a controlled manner as a disposal facility ages. The levels of radioactivity within the waste disposed of in a facility also need to be considered during the long-term evaluations, or performance assessments. Geosyntec has conducted performance assessments under several different regulatory settings to demonstrate that the disposal facilities are protective of human health and the environment, assessing both internal risks as the waste decays within the disposal facility and external to disposal facilities as the performance of the landfill construction materials age and are modeled at very long times (e.g., hundreds to thousands of years) to eventually transmit leachate and contaminants to the underlying geology. The results of the performance assessments are crucial towards our clients understanding of their design choices and future liabilities. When the U.S. Department of Energy (DOE) decided to decommission its nuclear weapons complex facilities at Fernald, Ohio, they relied on our expertise to design and provide construction quality assurance services for the low-level radioactive waste disposal facilities built to contain impacted soils and demolition debris. Geosyntec met aggressive DOE schedule requirements and delivered award-winning, state-of-the-art facilities with a design life of at least 200 years using currently available technology. In doing so, we helped DOE and its contractor teams complete site closure years ahead of their original schedules, and billions below the original estimate. When DOE decided to decommission its nuclear weapons complex facility at Portsmouth, Ohio, Geosyntec was again tapped to provide design and permitting for the on-site waste disposal facility. Geosyntec has also successfully assisted clients in the related practice area of management and containment of by-products and wastes that contain naturally occurring radioactive materials (NORM) associated with ore processing residuals. For example, a multinational company owned a processing facility with NORM and Technologically Enhanced Naturally Occurring Radioactive Material (TENORM) containing uranium and thorium impacts to buildings, equipment, and process area soils. Geosyntec assessed and characterized site conditions, then designed a secure, on-site disposal facility, dismantled ore processing equipment, and impacted soils. Our design addressed the liner and cover containment systems; sequencing for constructing, filling, and closing the facility; facility operation and maintenance; and post-closure environmental monitoring. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility. As the general contractor for the project, we implemented a stringent construction and radiological safety program. This included establishing and operating an on-site radiological laboratory capable of measuring gross alpha/beta activity and gamma spectroscopy on debris, impacted soils, airborne particulates, and water. When complete, over 11,000 loads of excavated soils and plant debris (or 75,000 cubic meters) were transported and disposed of in the facility and more than 87,000 drums were retrieved, processed, transported and disposed. The project was completed with more than 1 million man-hours without either a lost-time accident or a radiological incident, a testament to the importance of safety and the safety culture that Geosyntec has established.

Rudolph Bonaparte, PhD, PE, BC.GE, Dist.M.ASCE, NAE

2026-09-29T14:28:33-06:00October 18th, 2013|Tags: , , , , , |

Rudy Bonaparte is a Senior Principal Engineer based in Georgia with more than 40 years of professional experience focused on the areas of: geotechnical and geoenvironmental engineering; contaminated site, waterway, and sediment assessment and remediation; and solid, hazardous, and low-level radioactive (LLR) waste disposal facility permitting and design.

Innovative Evapotranspirative Monocover and Groundwater Remediation at the OII Landfill Superfund Site

2026-04-02T15:50:26-06:00October 27th, 2009|Tags: , , , , , , |

The 190-acre Operating Industries, Inc. (OII) Superfund Site is an inactive landfill site, about 10 miles east of Los Angeles, that for 30 years until 1984 received solid waste, and for a limited period, also accepted hazardous liquids. Parts of the landfill have steep slopes and waste up to 320 feet deep. The Site was placed on the National Priorities, or Superfund, List in 1986, and the U.S. EPA has referred to OII as "one of the most contaminated sites in the country." The entire Site is in an area of high seismic exposure and is immediately adjacent to residential neighborhoods, a commercial shopping complex, and the heavily-used Pomona Freeway. More than 20,000 people live within three miles of the Site. The U.S. EPA, under multiple Consent Decrees, required the PRP Group to implement a prescriptive full RCRA cap for the landfill and a traditional pump and treat system for hydraulic control and remediation of the groundwater. The cost estimate for this remedial method was $330 million. The PRPs then began looking for a more cost-effective alternative to the capping and groundwater treatment system. Any alternative method had to not only be more cost-effective, but it also had to be fully protective of human health and the environment.

CSM Development and Remedial Design for Contaminated Soils, Sediments, and Groundwater, Greens Bayou, Houston, Texas

2026-04-02T15:50:53-06:00October 27th, 2009|Tags: , , , , |

Starting in the early 1950s and continuing over a period of several decades, arsenicals and organochlorine pesticides, including DDT and Lindane, and production raw materials and intermediates, were released into soil, groundwater, and surface water adjacent to Greens Bayou, a part of the Houston Ship Channel system. These contaminants were transported into Greens Bayou and local tributaries to the bayou via industrial discharges, surface water runoff, and groundwater discharge and upwelling. Geosyntec was retained by counsel to the Port of Houston Authority (PHA) to evaluate remediation strategies and develop remediation cost estimates to mitigate the impacts associated with this contamination loading to Greens Bayou and the tributary waterways, the most significant tributary being a large Harris County Flood Control Channel (HCFCC).

Comprehensive Remediation Strategy to Address Soil and Groundwater Contamination at an NPL Site

2026-04-02T15:50:26-06:00October 24th, 2009|Tags: , , , , , |

The 388-acre Hanlin-Allied-Olin NPL site is a former chemical manufacturing complex near Moundsville, West Virginia. The southern portion of the facility produced chloromethane products and used the chlor-alkali (mercury cell) process to manufacture chlorine and sodium hydroxide. The northern portion of the facility produced numerous semi-volatile intermediates for the manufacture of plastics and other synthetic materials. The long-term objective for the site entailed cost avoidance through the proactive development of two significant remedial components: (i) a major removal action using on-site disposal, and (ii) control of chlorinated solvents in an aquifer used downgradient of the site for a municipal water supply. Both objectives related to a third objective of minimizing the Remedial Investigation/Feasibility Study (RI/FS) scope, thereby reducing long-term cost uncertainty.

Feasibility Evaluation of a Subaqueous Cap for Disposed Dredged Material, Palos Verdes Peninsula, California

2026-04-02T15:50:53-06:00October 24th, 2009|Tags: , , |

U.S. EPA had proposed placing a subaqueous cap over a 37 square mile of sea floor seaward of a major wastewater ocean outfall along the Palos Verdes peninsula in Los Angeles County, California. The intent of the subaqueous cap was to contain DDT and PCB impacted ocean floor sediments and reduce exposure to the sediments by benthic organisms. The water depth in the area of the proposed cap ranges from about 130 to 170 feet. This area is also subject to significant ocean currents and is seismically active (Palos Verdes Fault Zone). The proposed cap was to be placed by dumping hydraulically dredged sand and/or crushed rock from hopper barges. Geosyntec was retained by a group of Potentially Responsible Parties (PRPs) to be a member of a multi-disciplinary team to evaluate the feasibility of U.S. EPA's proposed capping remedy. Our specific role was to evaluate the geotechnical feasibility of the proposed plan.