Geosyntec Consultants Logo

Robert Bachus

Facility Decontamination and Decommissioning

2026-08-20T12:26:42-06:00March 28th, 2014|Tags: , , , , , , , , , , , , , , , , , , , , , |

Geosyntec's engineers and scientists aid many clients in the decommissioning and remediation of power plants, refineries, military facilities, NASA storage and assembly areas, and chemical manufacturing and distribution facilities. We also consult on the remediation and closure of dozens of industrial waste and solid waste containment facilities regulated under the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) and the Resource Conservation and Recovery Act (RCRA). Notably, Geosyntec practitioners were key members of the Closure Project Team for the U.S. Department of Energy's (DOE) Fernald Feed Production Center in Ohio, tasked with overseeing the removal of 31 million pounds of processed nuclear product, decontamination and demolition of 223 buildings, and removal of 8,900 cubic yards of radium-bearing waste. For this project, Geosyntec designed a hallmark on-site disposal facility (OSDF) to safely contain low-level radioactive waste and hazardous waste generated during the demolition and site cleanup process. We were selected as the engineer-of-record for the permitting, design, and quality assurance/quality control (QA/QC) services during construction, filling, and closure of the OSDF. The result is a secure 65-acre, eight-cell waste containment facility containing 2.95 million cubic yards of materials and capable of lasting at least 200 years, and up to 1,000 years to the extent achievable with available technology. At Fernald, Geosyntec redefined how modern containment systems could be used to securely dispose of hazardous and low-level radioactive waste. We have since been tasked with the design and construction of new OSDFs at both the DOE's Portsmouth and Paducah Gaseous Diffusion Plants in Ohio and Kentucky, respectively. In addition, Geosyntec engineers and scientists have contributed heavily to asset retirement and conversion services for the electric power industry. For a former waste-to-energy generating facility in Florida, we prepared the preliminary remedial design for a 60-acre site regulated under CERCLA. Our services included construction management, third-party construction quality assurance oversight, and laboratory testing services as well as oversight of the demolition of two incinerators, a 200-foot water tower, and miscellaneous process and administrative buildings. Our optimization of the remedy led to minimized construction costs and approval of design modifications, resulting in client cost savings in excess of $1.5 million. We also provided valuable assistance in negotiating construction claims, which resulted in additional client savings. For another client undergoing a large-scale renovation and expansion of a coal-fired power plant, Geosyntec performed pre-demolition hazardous materials assessments and coordinated the facility's coal handling/processing structure demolition. We subsequently provided implementation design, bidding support, oversight, and documentation of soil remedial action plans, coordinating it with demolition and renovation/expansion activities. By supporting the client and demolition/ construction contractors with time-critical waste profiling, segregation, and management and by acting as regulatory liaison, we helped maintain the project's crucial renovation and expansion schedule. Geosyntec worked with the City of Coral Gables, Florida to prepare the design and bid package for the demolition of a waste-to-energy incinerator and 50-ft tall stack that contained elevated concentrations of lead, arsenic, and dioxins. Our significant experience in the assessment, characterization, and ultimate disposal of incinerator ash helped our client remove the stigma that the site once had in the community and positioned the property for commercial redevelopment. Geosyntec has provided single-sourced services for clients planning to decommission and demolish industrial manufacturing facilities with the intent to obtain regulatory closure in support of the future sale of the property. At these facilities, Geosyntec performed site characterization, decommissioning, decontamination, hazardous building material assessments, oversight of abatement, development of bid documents and bid support, construction management, construction quality assurance, and oversight of scrap/asset recovery. Single-sourced services reduced the clients cost and time to obtain closure by requiring fewer contracts to administer and fewer consultant/contractor interfaces to manage. The coordination of the work is placed with one consultant - Geosyntec. At a former catalyst manufacturing facility in Southern California that produced catalyst for use in petroleum refining, Geosyntec assisted the client in preparing the site for sale as part of their plan for consolidating their manufacturing capabilities into one facility. Geosyntec performed decommissioning and decontaminating support, hazardous building material surveys, oversight of abatement and demolition, Phase I and Phase II site characterization and soil remediation, and obtained regulatory closure.  After Geosyntec completed the work and obtained the regulatory closure, the client sold the property as planned.  Geosyntec has successfully provided similar services to other industrial clients for facilities that include former electrical transformer manufacturing, oil and chemical refining and processing, and aerospace fastener manufacturing. One measure of the value of Geosyntec's services is the repeat business with clients. For example, the client with the catalyst manufacturing facility in Southern California contracted with Geosyntec to perform similar, additional decommissioning and demolition services at their Northern California manufacturing plant.

Geotechnical and Geostructural Engineering

2026-04-23T11:55:26-06:00March 27th, 2014|Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |

Geosyntec provides nationally recognized expertise and specialized geotechnical and geological engineering (geoengineering) services to evaluate and improve the design and construction engineering properties of soil and rock foundations. Our geoengineering specialists form one of the leading practices in the world. They are recognized for their ability to develop practical guidance, and efficient designs conducive to aggressive construction schedules commonly imposed by project economics. Our geoengineering practice focuses on difficult and challenging sites where the development of dependable, cost-effective foundations, and other geostructural solutions are critical to the success of the project. Our practitioners accomplish this by establishing a thorough understanding of the project site, developing a technical framework for the project, and incorporating the critical, non-engineering drivers such as schedule and project economics into the early stages of our planning. Our geoengineering professionals have responded to the challenges of increasingly unfavorable site conditions by developing and applying sophisticated approaches to investigate and characterize sites; analyzing foundation behavior; altering the engineering characteristics of the soil and rock at a specific site through soil and rock improvement; and environmentally remediating sites. We implement these approaches so foundations and other subsurface structures can be constructed safely, adequately support the built environment, and withstand potential geohazards. Our geotechnical practitioners are fully familiar and experienced with the practical application of these tools. For example, when a client needed to develop a critical structure near Wilmington Harbor in Delaware, the client turned to Geosyntec to geotechnically engineer a practical, cost-effective solution. Our team developed an innovative foundation design and construction methodology for very soft and compressible foundation materials that included wick drains, embankment pre-loading, and mechanically stabilized earthen walls. Our design saved the client nearly $100 million when compared to more traditional approaches proposed by others. Our geoengineering practitioners distinguish themselves by rapid development of an appropriate understanding of the geologic and environmental history of a site, and using this knowledge to screen potential ground improvement and foundation technologies (wick drains, deep soil mixing, deep dynamic compaction, vibro-replacement, and surcharging) to identify the more dependable and cost-effective approaches. These screening-level studies become a basis for gathering optimized geotechnical information based on carefully considered analyses tempered with practical, hands-on experience sufficient to not only characterize the site, but also design dependable foundations. These attributes have been particularly beneficial to our petroleum and chemical industry clients who are currently undertaking large-scale capital projects in undeveloped areas. For example, Geosyntec is working with oil and gas interests on foundation design, offshore reclamation, and underwater slope stability issues related to the development of a liquefied natural gas trans-shipment facility on the coast of southwestern Africa. Our senior practitioners have authored technical design and construction manuals for the Federal Highway Administration focusing on foundation support systems, earth retaining systems, and earthquake engineering. Geosyntec provides lead, geotechnical training instructors for the National Highway Institute and the American Society of Civil Engineers (ASCE). We also provide training to state departments of transportation, contractors, and consultants for state-of-the-practice design applications. Our staff members are active contributors and developers of the American Association of State Highway and Transportation Officials Load and Resistance Factor Design Specifications for bridge substructures including foundations and retaining wall systems. Several of our practitioners have received ASCE's highest awards for advancing the state of the practice in geoengineering.  

Radiological Waste Management and Disposal Facilities

2026-06-03T11:14:05-06:00March 27th, 2014|Tags: , , , , , , , , , , , , , , , , , , , , , , |

Geosyntec's practitioners work with regulators and stakeholders to develop solutions for a range of radiological challenges, including waste management and disposal, waste packaging and transportation, facility decontamination and decommissioning (D&D), and environmental restoration for government and private clients. Our established credibility with regulators contributes to securing the approvals needed to move demanding projects forward in a timely manner. Engineering and designing containment facilities for the safe, long-term disposal of radiological and mixed (radiological and hazardous) wastes challenges the norms in terms of technology demonstration, design life, and material performance. The extremely long half-lives of many radionuclides present in these wastes mean that the radiological characteristics of these materials will be persistent over long periods of time. This requires that they be disposed and managed in a controlled manner as a disposal facility ages. The levels of radioactivity within the waste disposed of in a facility also need to be considered during the long-term evaluations, or performance assessments. Geosyntec has conducted performance assessments under several different regulatory settings to demonstrate that the disposal facilities are protective of human health and the environment, assessing both internal risks as the waste decays within the disposal facility and external to disposal facilities as the performance of the landfill construction materials age and are modeled at very long times (e.g., hundreds to thousands of years) to eventually transmit leachate and contaminants to the underlying geology. The results of the performance assessments are crucial towards our clients understanding of their design choices and future liabilities. When the U.S. Department of Energy (DOE) decided to decommission its nuclear weapons complex facilities at Fernald, Ohio, they relied on our expertise to design and provide construction quality assurance services for the low-level radioactive waste disposal facilities built to contain impacted soils and demolition debris. Geosyntec met aggressive DOE schedule requirements and delivered award-winning, state-of-the-art facilities with a design life of at least 200 years using currently available technology. In doing so, we helped DOE and its contractor teams complete site closure years ahead of their original schedules, and billions below the original estimate. When DOE decided to decommission its nuclear weapons complex facility at Portsmouth, Ohio, Geosyntec was again tapped to provide design and permitting for the on-site waste disposal facility. Geosyntec has also successfully assisted clients in the related practice area of management and containment of by-products and wastes that contain naturally occurring radioactive materials (NORM) associated with ore processing residuals. For example, a multinational company owned a processing facility with NORM and Technologically Enhanced Naturally Occurring Radioactive Material (TENORM) containing uranium and thorium impacts to buildings, equipment, and process area soils. Geosyntec assessed and characterized site conditions, then designed a secure, on-site disposal facility, dismantled ore processing equipment, and impacted soils. Our design addressed the liner and cover containment systems; sequencing for constructing, filling, and closing the facility; facility operation and maintenance; and post-closure environmental monitoring. The requirement to consider a performance over a period of more than 10,000 years led to significant challenges in design and modeling of the disposal facility. As the general contractor for the project, we implemented a stringent construction and radiological safety program. This included establishing and operating an on-site radiological laboratory capable of measuring gross alpha/beta activity and gamma spectroscopy on debris, impacted soils, airborne particulates, and water. When complete, over 11,000 loads of excavated soils and plant debris (or 75,000 cubic meters) were transported and disposed of in the facility and more than 87,000 drums were retrieved, processed, transported and disposed. The project was completed with more than 1 million man-hours without either a lost-time accident or a radiological incident, a testament to the importance of safety and the safety culture that Geosyntec has established.

Seismic Hazard Evaluation and Ground Motion Studies

2026-04-23T12:27:44-06:00March 27th, 2014|Tags: , , , , , , , , , , , , , , , , , |

Geosyntec has played a leading role in the development of state-of-the-art liquefaction and seismic analyses for more than 20 years and has pioneered designing economical structures that safely resist the loads caused by earthquakes. Geosyntec is recognized nationally and internationally for our capability to analyze the liquefaction potential of dam embankments and their foundations, as well as to assess the impact of liquefaction on bridges, buildings, and other structures. Geosyntec has performed liquefaction evaluations for hundreds of projects, including assessment of the consequences of liquefaction and development of solutions to mitigate concerns. These solutions have included ground improvement designs followed by testing during construction to verify that design objectives were met.

Real Estate, Insurance and Finance

2026-10-29T10:49:29-06:00November 6th, 2013|Tags: , , , , , , , , , , , , , |

Real Estate, Insurance & Finance Connect With Us Real estate, insurance, and finance clients, along with their legal counsel, must make complex decisions about possible environmental risks inherent to their properties and property transactions. This often includes managing multifaceted remediation projects. Geosyntec combines our deep understanding of environmental engineering, science, and regulatory factors within the financial, insurance, legal, and risk-management frameworks that drive their projects. Our practitioners work as integrated members of our clients’ ....

Chemicals and Petrochemicals

2026-04-21T08:33:40-06:00November 6th, 2013|Tags: , , , , , , , , , , , , , , , , , |

Chemical and Petrochemical Services Site planning and permitting for air, land, and water Site feasibility analyses Brownfield site investigation and characterization Coordination with utilities, development boards, and collocated facilities Environmental due diligence Regulatory liaison Remediation system installation, operation, and maintenance Site management and regulatory strategies LNAPL and DNAPL assessment and remediation Human health and ecological risk assessments Vapor intrusion pathway evaluation Litigation support Natural Resource Damages (NRD) actions RCRA corrective actions Environmental database/GIS management ....

Innovative Evapotranspirative Monocover and Groundwater Remediation at the OII Landfill Superfund Site

2026-04-02T15:50:26-06:00October 27th, 2009|Tags: , , , , , , |

The 190-acre Operating Industries, Inc. (OII) Superfund Site is an inactive landfill site, about 10 miles east of Los Angeles, that for 30 years until 1984 received solid waste, and for a limited period, also accepted hazardous liquids. Parts of the landfill have steep slopes and waste up to 320 feet deep. The Site was placed on the National Priorities, or Superfund, List in 1986, and the U.S. EPA has referred to OII as "one of the most contaminated sites in the country." The entire Site is in an area of high seismic exposure and is immediately adjacent to residential neighborhoods, a commercial shopping complex, and the heavily-used Pomona Freeway. More than 20,000 people live within three miles of the Site. The U.S. EPA, under multiple Consent Decrees, required the PRP Group to implement a prescriptive full RCRA cap for the landfill and a traditional pump and treat system for hydraulic control and remediation of the groundwater. The cost estimate for this remedial method was $330 million. The PRPs then began looking for a more cost-effective alternative to the capping and groundwater treatment system. Any alternative method had to not only be more cost-effective, but it also had to be fully protective of human health and the environment.

Herbert Hoover Dike Rehabilitation Reach 1 Seepage Cutoff Wall at Lake Okeechobee, Florida

2026-04-02T14:30:47-06:00October 27th, 2009|Tags: , |

The Herbert Hoover Dike (HHD) rehabilitation project is designed to stabilize and secure the aging dike from potentially damaging severe weather events, and protect the numerous residents and businesses on the southeastern rim of Lake Okeechobee. In 2007, the U.S. Army Corps of Engineers (USACE) placed the HHD on the Top 10 list (at No. 6) of dams in the nation needing repair. The USACE Jacksonville District prioritized rehabilitation of segments that were identified as most vulnerable, focusing initial efforts on achieving the most significant impacts.

The cutoff wall, a critical design feature in the dike rehabilitation, will minimize existing internal erosion, known as "piping," and prevent further damage to the internal structure of the dike. A 22-mile stretch from Port Mayaca south to Belle Glade that is considered the most vulnerable section of the 143-mile dike is the first wall section to be built. The work began in 2008 and is scheduled for completion in 2012. In May 2008 the USACE Jacksonville District selected Bauer Foundation Corp. (BFC) for the first of four (4) major task orders to construct a total of 10 -miles of the planned cutoff wall that runs vertically from the dike crest to a depth of nearly 80 feet in certain locations. BFC selected Geosyntec as part of its team to provide construction quality control/quality assurance services, geotechnical engineering support, environmental protection monitoring, subsurface barrier construction consultation, and provide additional technical resources related to dam and levee rehabilitation.