Geosyntec Consultants Logo

Michael Dupuis

Michael Dupuis Publishes on Modeling of Subduction Earthquakes in Earthquake Spectra

2026-03-17T14:36:08-06:00November 4th, 2025|Tags: |

Michael Dupuis, PE, PEng, coauthored “Hybrid Broadband Ground-Motion Simulation Validation of Small-Magnitude Subduction Earthquakes in New Zealand” in Issue 41, Volume 4, of Earthquake Spectra in August 2025.

Geosyntec to Present on Dam Safety at ASDSO 2023

2026-03-15T10:24:27-06:00September 18th, 2023|Tags: , , , |

Geosyntec staff will make a significant technical contribution at the Association of State Dam Safety Officials (ASDSO) Conference at the Palm Springs Convention Center in Palm Springs, California, on September 17 through September 21, 2023.

Infrastructure Planning, Engineering, and Design

2026-08-31T14:16:52-06:00November 12th, 2014|Tags: , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |

Across industries and project types, delivery is increasingly shaped by regulatory complexity, environmental constraints, stakeholder expectations, and the need to accelerate schedules while managing costs.

Seismic Hazard Evaluation and Ground Motion Studies

2026-04-23T12:27:44-06:00March 27th, 2014|Tags: , , , , , , , , , , , , , , , , , |

Geosyntec has played a leading role in the development of state-of-the-art liquefaction and seismic analyses for more than 20 years and has pioneered designing economical structures that safely resist the loads caused by earthquakes. Geosyntec is recognized nationally and internationally for our capability to analyze the liquefaction potential of dam embankments and their foundations, as well as to assess the impact of liquefaction on bridges, buildings, and other structures. Geosyntec has performed liquefaction evaluations for hundreds of projects, including assessment of the consequences of liquefaction and development of solutions to mitigate concerns. These solutions have included ground improvement designs followed by testing during construction to verify that design objectives were met.

Go to Top