Geosyntec Staff Contribute to the World of Coal Ash 2019

2026-03-15T10:21:26-06:00May 8th, 2019|Tags: , , , , , , , , , |

Geosyntec professionals will make substantial technical contributions to the World of Coal Ash (WOCA) 2019 at the Union Station Hotel in St. Louis, Missouri on May 13-16, 2019.

John Seymour to Present at the American Coal Ash Association Ponded Ash Workshop

2026-03-15T10:21:09-06:00October 25th, 2018|Tags: , |

John Seymour, PE (Illinois) will be leading two sessions at the 2018 Ponded Ash Workshop in Louisville, Kentucky on October 30-31, 2018. This event is organized and hosted by the American Coal Ash Association (ACAA), the University of Kentucky Center for Applied Energy Research (UK CAER), and the Electric Power Research Institute (EPRI).

Beth Gross and John Seymour Served as Principal Investigators for the “Alternative Cover Systems for Coal Combustion Residuals Landfills and Surface Impoundments” Technical Report for the EPRI

2026-03-15T10:21:03-06:00August 8th, 2018|Tags: , |

Beth Gross, Ph.D., PE, D.GE, F.ASCE (Texas) served as Lead Principal Investigator and John Seymour, PE (Illinois) served as Co-Principal Investigator for the "Alternative Cover Systems for Coal Combustion Residuals Landfills and Surface Impoundments" Technical Report 2017 for the Electric Power Research Institute (EPRI).

Geosyntec’s Technical Contribution to the World of Coal Ash

2026-03-15T10:20:20-06:00May 5th, 2017|Tags: , , , , , , , , , , , |

As in previous years, Geosyntec will make a significant technical contribution to 2017 World of Coal Ash Conference (WOCA) at the Lexington Convention Center & Hyatt Hotel in Lexington, Kentucky on May 8-11, 2017.

John Seymour to Teach a Short Course for ACAA Workshop

2026-03-15T10:19:58-06:00November 1st, 2016|Tags: |

John Seymour (Illinois) will teach a short course entitled "Geotechnical Considerations in Surface Impoundment Management and Closure" at the American Coal Ash Association (ACAA) and University of Kentucky Center for Applied Energy Research (CAER) Midwest Workshop on Current Issues in Ponded CCPs at the Radisson Hotel Cincinnati Riverfront in Covington, Kentucky on November 2, 2016.

Coal Combustion Residuals Pond Closure Guidance Documents

2026-04-02T15:28:24-06:00July 24th, 2015|Tags: , , |

In December 2008 a slope stability failure at a fly ash disposal facility in the United States caused significant environmental impacts to surface water. Consequently, the electric utility industry was concerned about static liquefaction of fly ash that could lead to failures at other facilities. The utilities, through the Electric Power Research Institute (EPRI), retained Geosyntec to conduct research into fly ash geotechnical properties and static liquefaction.

Design and Permitting for Closure of a Fly Ash Reservoir High Hazard Dam Modification

2026-04-02T15:28:17-06:00July 24th, 2015|Tags: , |

Geosyntec's client, a power plant in Ohio, generates electricity from two, 1,300-MW, coal-fired units. In anticipation of upcoming federal coal combustion residuals (CCR) regulations, the client decided to initiate closure design for a 300-acre fly ash pond. The site also features a high hazard dam. Acid mine drainage (AMD) from around the reservoir reduces the pH of the water and is currently treated in the reservoir.

Slope Remediation Strategy and Implementation at a Fly Ash Disposal Basin

2026-04-02T15:28:22-06:00July 24th, 2015|Tags: , , |

The project site is a nearly 400-acre fly ash disposal basin for a very large, coal-fired electricity generating facility in Michigan. The fly ash disposal basin is enclosed by a 3.5-mile long, 40-foot high, compacted clay embankment.

Design and Permitting of a Flue Gas Desulfurization Residuals Waste Landfill Over an Existing Ash Pond

2026-04-02T15:28:20-06:00July 23rd, 2015|Tags: , , |

An American Electric Power plant in Ohio generates electricity from two, 1,300-MW, coal-fired units. The client's objective for the project was to have additional capacity for residual waste disposal available at a reasonable construction cost before the existing coal ash residual waste landfill (RWL) reached capacity in approximately 18 months.