CSM Development and Remedial Design for Contaminated Soils, Sediments, and Groundwater, Greens Bayou, Houston, Texas

2026-04-02T15:50:53-06:00October 27th, 2009|Tags: , , , , |

Starting in the early 1950s and continuing over a period of several decades, arsenicals and organochlorine pesticides, including DDT and Lindane, and production raw materials and intermediates, were released into soil, groundwater, and surface water adjacent to Greens Bayou, a part of the Houston Ship Channel system. These contaminants were transported into Greens Bayou and local tributaries to the bayou via industrial discharges, surface water runoff, and groundwater discharge and upwelling. Geosyntec was retained by counsel to the Port of Houston Authority (PHA) to evaluate remediation strategies and develop remediation cost estimates to mitigate the impacts associated with this contamination loading to Greens Bayou and the tributary waterways, the most significant tributary being a large Harris County Flood Control Channel (HCFCC).

Herbert Hoover Dike Rehabilitation Reach 1 Seepage Cutoff Wall at Lake Okeechobee, Florida

2026-04-02T14:30:47-06:00October 27th, 2009|Tags: , |

The Herbert Hoover Dike (HHD) rehabilitation project is designed to stabilize and secure the aging dike from potentially damaging severe weather events, and protect the numerous residents and businesses on the southeastern rim of Lake Okeechobee. In 2007, the U.S. Army Corps of Engineers (USACE) placed the HHD on the Top 10 list (at No. 6) of dams in the nation needing repair. The USACE Jacksonville District prioritized rehabilitation of segments that were identified as most vulnerable, focusing initial efforts on achieving the most significant impacts.

The cutoff wall, a critical design feature in the dike rehabilitation, will minimize existing internal erosion, known as "piping," and prevent further damage to the internal structure of the dike. A 22-mile stretch from Port Mayaca south to Belle Glade that is considered the most vulnerable section of the 143-mile dike is the first wall section to be built. The work began in 2008 and is scheduled for completion in 2012. In May 2008 the USACE Jacksonville District selected Bauer Foundation Corp. (BFC) for the first of four (4) major task orders to construct a total of 10 -miles of the planned cutoff wall that runs vertically from the dike crest to a depth of nearly 80 feet in certain locations. BFC selected Geosyntec as part of its team to provide construction quality control/quality assurance services, geotechnical engineering support, environmental protection monitoring, subsurface barrier construction consultation, and provide additional technical resources related to dam and levee rehabilitation.

Optimizing the Design Process for Dredged Material Containment Area Dike Raisings Adjacent to Savannah River Harbor

2026-06-16T14:30:21-06:00October 26th, 2009|Tags: , |

The Savannah River Harbor requires periodic dredging to support commercial shipping traffic. These materials are disposed within a series of diked, dredged material containment areas (DMCAs) located on the eastern side of the Savannah River in Jasper County, South Carolina. Under mutual agreement, the US Army Corps of Engineers dredges the materials from the Port and disposes the materials in specific DCMAs identified by the Chatham County (Georgia) Engineers Office. Under this agreement, the Georgia Department of Transportation (GDOT) is responsible for the design and maintenance of the DCMAs which occupy 5,635 acres of land and are bounded by nearly 44 miles of front, back, and divider dikes. Part of this responsibility is to design and stage the requisite dike raisings to provide sufficient dredged materials storage capacity along an 18-mile long reach of the river. At the time of the project, the previous two dike raisings initiated a series of relatively small and localized slope stability failures. Relatively expensive short-term stability measures had to be developed by GDOT to provide the requisite storage capacity. GDOT's primary objective for the project was development of a strategy for optimizing dike construction and DMCA management so that cost-effective long-term dredge material containment could be provided.

Interactive Geographical Information Systems and Application Development for Data Management, Herbert Hoover Dike Rehabilitation, Lake Okeechobee, Florida

2026-06-16T14:30:18-06:00October 23rd, 2009|Tags: , |

The Herbert Hoover Dike (HHD) rehabilitation project is designed to stabilize and secure the aging dike from potentially damaging severe weather events, and protect the numerous residents and businesses on the southeastern rim of Lake Okeechobee. In 2007, the U.S. Army Corps of Engineers (USACE) placed the HHD on the Top 6 list of dams in the nation needing repair. The USACE Jacksonville District prioritized rehabilitation of dike segments that were identified as most vulnerable, focusing initial efforts to achieve the most significant impacts. In May 2008 the Jacksonville District selected Bauer Foundation Corp. (BFC) to construct a 3-mile long segment of the planned cutoff wall that runs vertically from the dike crest to a depth of 70 feet in certain locations.The challenge of compiling and viewing the large quantity and diversity of data collected for this project required an innovative solution. In December 2008 BFC selected Geosyntec to develop an application by which BFC and its client, USACE, could view the data as it is collected and interactively search for values and generate time-critical reports.