This concrete dam built in the 1940s includes a gated spillway section, powerhouse, and nonoverflow sections in the center of the dam with zoned fill embankment on the left and right sides of the concrete structures. Concrete core walls were constructed in the embankment wrap around areas to provide seepage control. Early in the service life of the facilty settlement in retaining walls on the crest and downstream rotational movement of the concrete core walls were observed. Retaining wall settlements on the order of several feet and core wall deformations on the order of 5 inches in the downstream direction were recorded. The objective of the project was to identify and fill data gaps related to dam performance, develop comprehensive models of the structures, identify causal mechanisms, and perform a field investigation to evaluate the conditions contributing to deformations and the current state of the dam related to risk driving Potential Failure Modes (PFMs)