Geosyntec Consultants Logo

Andrew Nelson

Quantitative Risk Assessment for a Floating Production Storage and Offloading in Brazil

2026-04-02T17:05:12-06:00May 8th, 2016|Tags: , , , , , |

Geosyntec undertook a quantitative risk assessment (QRA) for the Cidade de Paraty Floating Production Storage and Offloading (FPSO) vessel, which will operate in the Lula oil field. The Lula oil field, which is the largest hydrocarbon find in the world since the Kazakh Kashagan discovery in 2000, is located in the Santos Basin, 250km south of Rio de Janeiro. It is estimated to hold five to eight billion barrels of oil equivalent. Due to the size of the field and the water depth, which in areas is in excess of 2000m, it will be developed using a number of FPSOs.

Quantitative Risk Assessment for LNG Offshore Central Processing Facility in Australia

2026-03-08T09:15:25-06:00May 8th, 2016|Tags: , , , , , |

Geosyntec prepared the quantitative risk assessment (QRA) for the Browse liquified natural gas (LNG) offshore central processing facility (CPF) during the front-end engineering design (FEED) stage of this multi-billion dollar project.

Review of Chlorine Contact Tank for a Spring Water Treatment Works in England

2026-04-02T16:32:51-06:00May 8th, 2016|Tags: , , , , |

Upton Scudamore Water Treatment Works (WTW) is a groundwater treatment works located near Warminster in Wiltshire. The works has a maximum daily output of 15Ml/d, and the water can supply over 100,000 customers in the surrounding area. Upton Scudamore WTW is supplied with raw water from three distinct sources; two from ground water springs (9 Ml/d total) and another from boreholes (6 Ml/d). Tailored treatment processes are required for the springs (chlorine disinfection only) and boreholes (iron oxidation, then filtration and chlorine disinfection).

Go to Top