Quantitative Risk Assessment for a Floating Production Storage and Offloading in Brazil
Geosyntec undertook a quantitative risk assessment (QRA) for the Cidade de Paraty Floating Production Storage and Offloading (FPSO) vessel, which will operate in the Lula oil field. The Lula oil field, which is the largest hydrocarbon find in the world since the Kazakh Kashagan discovery in 2000, is located in the Santos Basin, 250km south of Rio de Janeiro. It is estimated to hold five to eight billion barrels of oil equivalent. Due to the size of the field and the water depth, which in areas is in excess of 2000m, it will be developed using a number of FPSOs.




