Marineland Dolphin Adventure FEMA Preliminary Flood Map Appeal, St. Johns County, Florida

Marineland Dolphin Adventure FEMA Preliminary Flood Map Appeal, St. Johns County, Florida

Client

Georgia Aquarium (Owner, Marineland Dolphin Adventure)

Services Provided

Data Review and Collection; Revetment Failure and Runup Analysis; Mapping; Submission of Appeal Package

Aerial view of an outdoor aquatic facility with multiple blue pools in various shapes, surrounded by a concrete deck, buildings, a road, palm trees, and a rocky shoreline next to a sandy beach.

Location

St. Johns County, Florida

Project Practice Areas

Coastal & Waterfront

Type of Facility

Aquarium

Project Specifics

Geosyntec prepared a successful appeal of the preliminary Federal Emergency Management Agency (FEMA) Flood Insurance Rate Map (FIRM).

Geosyntec Scope of Services

We reassessed the landward location of Flood Zone VE as determined by FEMA on the revised FIRM. Marineland Dolphin Adventure is located behind a granite revetment designed for a 30-year storm event, and the landward extent of the VE zone was based on the assumption of the existence of primary frontal dune (PFD) at this site.

To assess the potential for moving the VE line west and accounting for protection afforded by the revetment, we initiated a preliminary study that required review of the following:

  • Preliminary Flood Insurance Study (FIS) report for St. Johns County
  • FEMA wave model (WHAFIS) transects
  • LiDAR/DEM data used in the models
  • Revetment design and peak flood discharge (PFD) occurrence and characteristics in LiDAR and survey data

As part of the successful appeal package submitted to FEMA, we provided the following services:

  • Conducted a detailed review of FEMA preliminary data and historic data
  • Performed a partial-revetment-failure and wave-runup analysis
  • Re-ran WHAFIS runs with better site-specific information
  • Created a revised map and completed a PFD appeal package

Notable Accomplishments

Our assessment found potential items of appeal that would support a request to relocate the Flood Zone VE boundary. The appeal resulted in moving a portion of the primary frontal dune out of Flood Zone VE.

Note: At the time of this project, Geosyntec practitioners were contracted as ATM, which was acquired by Geosyntec.