LADWP Stormwater Capture Master Plan
Client
Los Angeles Department of Water and Power
Services Provided
Surface water resources, Local supply development, Strategic Planning, Policy/ordinance development, Public outreach and stakeholder participation, Multi-agency coordination, Stormwater management, Multi-benefit project development, Climate resiliency planning and analyses, Funding/resource valuations
Location
Los Angeles, California
Project Practice Areas
Water & Wastewater, Environmental Management, Water and Natural Resources
Type of Facility
Local water supply
Project Specifics
The Los Angeles Department of Water and Power (LADWP) has invested heavily in increasing the amount of local stormwater captured for water supply through projects like the Hansen Spreading Grounds Enhancement Project, the Big Tujunga Dam Retrofit, and the Woodman Avenue Stormwater Capture Project.
The Department has also invested internally, developing the Watershed Management Group – staffed by six engineers and a Water Works Engineering Manager within the Water Resources Division – to provide technical leadership on behalf of the Department. Now, the Department has developed a Stormwater Capture Master Plan to completely understand the potential stormwater that can be realistically and reliably captured to augment the City’s water supply portfolio. The Master Plan investigates existing and proposed programs, policies, and projects to better manage runoff from individual parcels and from the larger watersheds flowing into, and within, the City.
Geosyntec Scope of Services
Geosyntec synthesized existing and planned actions by the Department, the LA County Flood Control District, other City agencies, and local non-governmental entities that impact stormwater to ensure that the Master Plan complements and enhances significant stormwater capture efforts already in progress. In addition, Geosyntec calculated the amount of stormwater generated by the subwatersheds tributary to and within the City of Los Angeles. Geosyntec also investigated multiple constraints associated with capturing stormwater for beneficial use to determine the realistic amount of stormwater the City can reliably depend upon and the impact that this amount of stormwater capture would have on surface water quality improvements and peak flow attenuation in the Los Angeles River.
Notable Accomplishments
Following the inventory and model development tasks, Geosyntec compiled and analyzed an extensive list of potential stormwater capture alternatives (policies, ordinances, projects, programs) to truly compare the strategic and business case aspects for each project, individually and as part of a larger suite of alternatives. The Geosyntec Team has developed centralized and distributed stormwater capture programs and projects to compare alongside the existing list, including the Tujunga and Pacoima Spreading Grounds project. Geosyntec crafted an implementation plan from the suite of selected alternatives to create a roadmap for the Department that capitalizes on political, physical and financial opportunities.
Related Projects
Geosyntec
United States
U.S. General Services Administration
Lakewood, Colorado, USA
Fortune 500 Aerospace Client
San Gabriel Valley, California
The City of Westminster
Westminster, Colorado
St. Augustine Public Works Department
St. Augustine, Florida
Michael Van Valkenburgh Associates Inc.
Toronto, Ontario, Canada










