Hudayriyat Island East and Central
Client
MODON Properties
Services Provided
Project Management; Field Survey Works Evaluation; Land Reclamation And Ground Improvement Strategy; Hills Development; Coastal Studies Such As Metocean Study, Wave Transformation Modeling, Wave Agitation Modeling (Downtime Due To Waves); Tidal Hydrodynamic Modeling; Water Renewal Modeling; Sediment Plume Modeling; Shoreline Evolution Modeling; Physical Modeling; Design Basis Report; Marina Concept Design; Detailed Design Including Aids To Navigation; Tender Package For Both Marine And Earthworks; Tender Support For Both Marine And Earthworks; Construction Documentation Package And Final Bill Of Quantities (BOQ); Site Supervision Services
Location
Abu Dhabi, UAE
Project Practice Areas
Coastal & Waterfront
Project Specifics
Hudayriyat Island is a reclaimed landmass adjacent to Abu Dhabi’s main island and occupies an area of approximately 29.6 square kilometers. It will have approximately 30 kilometers of waterfront developments on all sides, along with housing for Emiratis, commercial, and leisure use. The master plan details turning Hudayriyat island into mixed-use community themed around culture, coastline living, pearl diving, and nature.
Geosyntec was chosen to design 33 kilometers of edges as well as dredging, reclamation, ground improvement, and Hill design, which included significant coastal modeling.
Geosyntec Scope of Services
As part of the Hudayriyat Island East and Central project, Geosyntec practitioners supported the detailed design and construction supervision of 2 kilometers of beach, 12 kilometers of rock revetment, 6 kilometers of edge treatment, and 60-meter-high hills.
Notable Accomplishments
In 2019, we prepared a coastal master plan that converted the existing beach-maintenance plan to an overall coastal master plan for the oceanfront, which is an 8-mile shoreline and two inlets. The plan identifies short-term and long-term goals, strategies, and projects, and the final plan is the result of three public meetings and two work sessions with the Town’s Inlet and Beach Protection Board.
Note: At the time of this project, Geosyntec practitioners were contracted as ATM, which was acquired by Geosyntec.
Related Projects
USACE St. Louis District and Bauer Foundation Corp
East St. Louis, Illinois
Island Global Yachting (IGY)
St. Thomas, US Virgin Islands










