Environmental Management, Waste Management, Water & Wastewater
Groundwater Geochemistry Support for Alternative Source Demonstrations at CCR Facilities
The (U.S. EPA) issued the Coal Combustion Residual (CCR) Rule in 2015 to regulate the location, design, and operation of ...

Environmental Management, Waste Management, Water & Wastewater
Development of a Guidance for Natural Attenuation as a Remedial Technology at CCR Facilities
Geosyntec developed a monitored natural attenuation (MNA) framework for the Electric Power Research Institute (EPRI). This framework was applied at ...

Environmental Management, Waste Management
Engineering and Closure-Related Services at Coal Combustion Residual Storage Facilities
Geosyntec has supported utility clients in the southeastern U.S. since 2011 to develop solutions to challenging coal combustion residuals (CCR) ...

Environmental Management, Waste Management
CCR Rule Compliance Assessment at Three Coal-Fired Power Plants
Our electricity-generating client retained Geosyntec to conduct compliance assessments at three coal-fired power plants for eight coal combustion residual (CCR) ...

Environmental Management, Waste Management
CCR Pond Closure Services and Wet-to-Dry Ash Conversion
Geosyntec's client, a large electric power utility, retained us at the Winyah Generating Station to provide a variety of services ...

Environmental Management, Waste Management
Research and Guidance Documents for the Land Disposal and Storage of Coal Combustion Residuals
Electric power generating companies that burn coal for fuel realized they needed information to effectively manage the storage of their ...

Environmental Management, Waste Management
Design and Permitting for the Closure of a Fly Ash Reservoir
Our client owns a power plant in Ohio that generates electricity from two 1,300-MW coal-fired units. In anticipation of upcoming ...

Environmental Management, Waste Management
Design and Permitting Services for a Coal Combustion Residuals Waste Landfill
The owner of a power plant in Ohio that generates electricity from two 1,300-MW coal-fired units required an additional 47 ...

Environmental Management, Waste Management
Slope Remediation at a Fly Ash Disposal Basin/Landfill
The project site is a 410-acre fly ash disposal basin (permitted as a Type III landfill in the long term) ...

Environmental Management, Waste Management
Permitting and Construction Design Services for Expansion of an Ash Landfill and CCR Pond Cleanout
The 80-year old R. Paul Smith coal-fired electricity generating plant in Maryland produces approximately 90 megawatts of power, however its ...

Environmental Management
Emergency Response Plans for CCR Landfills
Coal combustion residuals (CCR), are typically managed in impoundments or in landfills. With several high profile failures of impoundments around ...

Environmental Management
Process Safety Management for Ammunition and Explosives Facilities
Over the past 20 years, Geosyntec has provided health and safety and industrial hygiene services for 14 General Dynamics Ordnance ...

Environmental Management
Industrial Hygiene Employee Exposure Assessments and Sound Level Survey
Industrial hygiene (IH) assessments are conducted to accurately evaluate worker exposures to chemical, physical and biological agents in the workplace ...

Environmental Management
Food Storage Process Safety Management and Risk Management Plan for Food Storage
This grocery chain operates six facilities that use ammonia refrigeration processes to provide cooling and freezing to large perishable storage ...

Environmental Management
Bulk Liquid Terminal Preliminary Audit Services
The client, who operates three bulk liquid terminals in the Western United States, has a very structured Environmental Health and ...

Environmental Management
Citrus Processor Process Safety Management and Risk Management Plan
A citrus processor operates two ammonia refrigeration systems to provide cooling to perishable storage and manufacturing areas. These processes contain ...

Environmental Management
Lockout/Tagout Support for Multiple Facilities
The OSHA standard for The Control of Hazardous Energy (Lockout/Tagout), Title 29 Code of Federal Regulations (CFR) Part 1910.147, addresses ...

Environmental Management
Process Safety Management for Pipe Joining Solvent Manufacturer
The facility produces a broad range of polyvinyl chloride (PVC) and chlorinated polyvinyl chloride (CPVC) and acrylonitrile butadiene styrene (ABS) ...

Environmental Management
Industrial Hygiene Services for Solar Generating Facilities
A large solar generating firm requested Geosyntec to develop industrial hygiene methodology for unique contaminants at the site and conduct ...

Environmental Management
OSHA Respirable Silica Rule Compliance for a Glass Producer
The Ardagh Group Glass Division requested that Geosyntec provide employee exposure monitoring services to prepare for compliance with the new ...

Contaminated Sites
Removal and Treatment of Lead-Contaminated Soil Midway Atoll National Wildlife Refuge
Midway Atoll is a 2.4-square-mile atoll in the North Pacific Ocean, roughly equidistant between North America and Asia. Until 1993, ...

Waste Management, Water and Natural Resources
River Channel Risk Management Design and Construction Support
The Port Lands Flood Protection and Enabling Infrastructure Project (PLFP) is a major brownfield redevelopment project in Toronto, Ontario, Canada, ...

Air Quality, Contaminated Sites
Vapor Intrusion Mitigation System Using a Cupolex® Aerated Floor Design
Our client, a banking firm, was building a new 4,000-square-foot bank at a former gasoline station site in Denver. Because ...

Air Quality, Contaminated Sites
Innovative Vapor Sampling Techniques for Site Redevelopment Preparation
Geosyntec's client needed to assess redevelopment options for a 15-acre property that formerly housed a metal fabricating facility, now demolished, ...

Air Quality, Contaminated Sites
Fort Gillem Vapor Intrusion Assessment and Mitigation
Under subcontract to SES Construction and Fuel Services, Geosyntec provided environmental services related to the subsurface-to-indoor air vapor intrusion (VI) ...

Air Quality, Contaminated Sites
Vapor Intrusion Mitigation Systems at a Multi-Family Complex
Cupolex Building Systems (CBS) retained Geosyntec to design aerated floor vapor intrusion mitigation systems for seven buildings at a brownfield ...

Air Quality, Contaminated Sites
Passive Vapor Intrusion Mitigation System Using a Cupolex® Aerated Floor
As part of the mixed used redevelopment of a 40,000-square-foot former cutlery manufacturing building in upstate New York, the property's ...

Air Quality, Contaminated Sites
Combining Technical Acumen with Effective Community Outreach at a Vapor Intrusion Site
A release of chlorinated solvents led to impacts to the shallow aquifer underlying an active manufacturing facility with a residential ...

Air Quality, Contaminated Sites
Brownfields Redevelopment and Vapor Intrusion Mitigation System Design
A former food manufacturing facility sat idle for nearly a decade prior to being redeveloped as a four-story, 2.6-million-square-foot warehouse ...

Air Quality, Contaminated Sites
Rapid Vapor Intrusion Characterization and Treatability Testing at an Active Military Facility
Historical operations resulted in trichloroethene (TCE) releases to soil and groundwater beneath a large military manufacturing building at the Corpus ...

Environmental Reporting for a Paper Coating and Laminating Facility
A family-owned paper coating and laminating facility that had operated in New Berlin, Wisconsin, since the 1920s did not have ...

Dam Seismic Hazard and Embankment Response
This earth-rock dam, including embankment and powerhouse facilities, was constructed between 1923 and 1925. The dam impounds a 3,600-acre lake, ...

Comprehensive Continuing Coastal Engineering Services
ATM, a Geosyntec Company, is the on-call coastal engineering consultant for Holden Beach, North Carolina, and provides specialized expertise to ...

Site Adjustment Factors Applied to Response Spectra for Hard Rock Dam Sites
A power utility previously conducted seismic hazard evaluations for their portfolio of dams in the Sierra Mountain region of California ...

Seismic and Probable Maximum Flood Safety Evaluations for a Concrete Dam
Stability under seismic and probable maximum flood loads was performed for a 345-foot-high thick arch concrete dam located in the ...

Dam Soil-Structure Interaction Model
This concrete dam built in the 1940s includes a gated spillway section, powerhouse, and nonoverflow sections in the center of ...

Portugues Dam Comprehensive Nonlinear Incremental Thermal Stress-Strain Analysis
Portugues Dam is a 220-foot-high and 1,230-foot-long Roller Compacted Concrete thick arch dam located in Ponce, Puerto Rico. The dam ...

Concrete Gravity Dam Stress and Stability Evaluation
This concrete gravity dam is approximately 77 feet high and 375 feet long and supports a reservoir that primarily serves ...