Featured Projects
Read about our exemplary projects to learn how our consultants work across regions, practices, and markets to deliver exceptional solutions, without exception.
All Projects

Environmental Management, Water & Wastewater, Water and Natural Resources
Progressive Design Build and Stormwater P3 Project for the San Fernando Valley Green Streets Network
LA Sanitation and Environment (LASAN), in partnership with the Los Angeles Department of Water and Power (LADWP) and the California ...

Air Quality, Environmental Management
Air Pollution Control Device Selection & Air Permitting
Geosyntec was retained by a confidential client to remediate a 37-acre former manufacturing facility in Newark, New Jersey ...

Environmental Management, Geotechnical
Final Deposition Plan and Sustainable Closure Design for Tailings Storage Facility
The mine is located in western Mali. Exploitation of gold-bearing oxide and sulfide ores commenced in 1997, meaning acid mine ...

Environmental Management, Water & Wastewater
Remedial Design and Construction Support of the Kendall Bay Sediment Remediation
Once home to the largest manufactured gas plant (MGP) in the southern hemisphere, Kendall Bay in Sydney, Australia is now ...

Air Quality, Environmental Management, Geotechnical, Water and Natural Resources
Geosyntec implemented a Soil Management Plan for solid waste materials at transmission pole installation locations.
Worker safety assessment and preparation of a Soil Management Plan (SMP) for the excavation, management, and disposal of solid waste ...

Environmental Management, Geotechnical
Linear Project Services – Sunrise Powerlink
The Sunrise Powerlink is an approximately 120-linear-mile electrical transmission line and related features which traverse a wide variety of land ...

Environmental Management, Water and Natural Resources
Nelson to Manena 230kV Project
Geosyntec was retained by Entergy Louisiana, LLC (Entergy) to provide support for their proposed Nelson to Manena 230kV project near ...

Geotechnical
Access Design Services for Transmission Structure Replacement
Dominion Energy contacted Geosyntec to design an access road and working pad to provide the utility with the ability to ...

Contaminated Sites, Water & Wastewater
Sediment Characterization to Support Dam Removal on the Eel River
The California State Coastal Conservancy (SCC) and others are exploring alternatives, including dam removal, for relicensing the Potter Valley Hydropower ...

Contaminated Sites, Water & Wastewater
Pre-Remedial Design Investigation and Baseline Sampling for the Portland Harbor Superfund Site
Ten miles of the Lower Willamette River in highly urbanized downtown Portland have been impacted with PCBs, metals, and PAHs ...

Contaminated Sites, Water & Wastewater
Enhanced Natural Recovery/Activated Carbon Pilot Study of the Lower Duwamish Waterway
The Lower Duwamish Waterway (LDW) Superfund Site is a five-mile-long, 440-acre, federally authorized navigation channel that has served the City ...

Contaminated Sites, Water & Wastewater
Remedial Design Services at the Gowanus Canal Superfund Site
The Gowanus Canal Superfund Site is a large sediment mega-site in Brooklyn, approximately two miles long with construction dating to ...

Contaminated Sites, Water & Wastewater
RI/FS Peer Review and Strategy Development Services for the Newtown Creek Superfund Site
Newtown Creek in Brooklyn and Queens, New York, a large sediment megasite, is almost four miles long and was one ...

Contaminated Sites, Water & Wastewater
Ada Pond Sediment Investigation, Remedial Design, and Construction Management
Rio Tinto has responsibility for this site through its subsidiary company, Alcan Global Pharmaceutical Packaging Inc. (Alcan) ...

Geotechnical
FERC Part 12D Safety Review for the Oroville Dam Complex
The Oroville Dam Complex is owned and operated by the California Department of Water Resources (DWR). It consists of three ...

Environmental Management
Lockout/Tagout Procedures Inspections at Manufacturing Facility
The Occupational Safety and Health Administration (OSHA) cited the manufacturing facility for failing to conduct required lockout/tagout (LOTO) procedure annual ...

Contaminated Sites
Investigations into the Presence of Emerging Contaminants at an Active Military Installation
A pond at Robins Air Force Base (AFB) was used to contain runoff from aircraft maintenance hangars in the event ...

Contaminated Sites
App-based Data Collection and Management for a Phase II Remedial Investigation
The U.S. Army Corps of Engineers (USACE) conducted a remedial investigation (RI) on Atka Island in the Aleutian Island chain ...

Water & Wastewater
Design-Build Services for a Groundwater Treatment System at a Coal Ash Landfill
Geosyntec designed a low-maintenance groundwater treatment system to prevent arsenic discharge from a coal ash landfill into the Great Lakes ...

Geotechnical
Coal Ash Pond Closure Design at the Chesterfield Power Station
In order to meet the requirements of the federal coal combustion residual (CCR) rule, Dominion Virginia Power has undertaken several ...

Air Quality
Leaf River Energy Center Project
The Leaf River Energy Center Project has included air permitting, monitoring, and reporting services to support the continued operation of ...

Geotechnical
Updating Numerical Thermal Models to Ensure Regulatory Compliance
The Tennessee Valley Authority (TVA) manages a large system which includes fossil and nuclear plants, dams, and reservoirs ...

Geotechnical
Feijão Dam Failure Investigation
On 25 January 2019, Dam B-1 at Vale S.A.'s (Vale) Córrego do Feijão Iron Ore Mine, located nine kilometers northeast ...

Geotechnical
Dam Safety and Instrumentation Monitoring
In response to a sinkhole discovered near the downstream toe of the earthen embankment at Boone Dam, and subsequent muddy, ...

Geotechnical
Inundation Mapping Updates for Emergency Action Plans
The Tennessee Valley Authority (TVA) River Operations, which regulates a system of 49 reservoirs spanning seven states, maintains Emergency Action ...

Environmental Management, Waste Management, Water & Wastewater
Site Characterization, Risk Assessment, and Corrective Measures Study for a CCR Landfill
Geosyntec evaluated the nature and extent of potential impacts to groundwater and surface water, developed and evaluated a range of ...

Environmental Management, Waste Management, Water & Wastewater
Closure and Groundwater Remediation at Coal Ash Storage Ponds
Geosyntec was retained as a national expert on coal combustion residual (CCR) remediation to join an existing team of consultants ...

Environmental Management, Waste Management, Water & Wastewater
Alternate Source Demonstrations for Federal CCR Rule Groundwater Monitoring
Geosyntec developed a groundwater compliance strategy for an electric cooperative's fleet of CCR disposal units to address constituents in groundwater ...

Contaminated Sites
Decontamination, Decommissioning and Demolition (DD&D) of Former Pharmaceutical Facilities
Our practitioners were retained by two pharmaceutical manufacturing suppliers in New Jersey and an industrial developer in Colorado for subject ...

Environmental Management, Waste Management, Water & Wastewater
Statistical Evaluation of Groundwater Monitoring Data for Compliance with Coal Combustion Residual Rule
The U.S. EPA issued the Coal Combustion Residual (CCR) Rule in 2015 to regulate the location design and operation of ...

West Fork of the Hoquiam Dam Removal and Water Supply Source Replacement
The City of Hoquiam, Washington, constructed a concrete dam on the West Fork of the Hoquiam River in 1956 to ...

Groundwater Extraction and Treatment System
Our client operates an aqueous-film-forming foam research and development and fire-training facility in the Midwest. Per- and polyfluoroalkyl substances (PFAS) ...

Emissions Control Technology Training Program for Global Mining Client
Geosyntec was engaged by a global mining client to review and improve the operation and maintenance program for the eight ...

Confidential Client Greenhouse Gas Inventory Audit and Verification United States and Europe
A global manufacturing client with over 100 facilities across North America, Europe, and the South Pacific sought an independent audit ...

Regional Haze Four-Factor Analysis for Paper Company
Geosyntec was engaged by McKinley Paper Company to review the reasonably available control technologies (RACT) for the facility’s power boilers ...

Corporate Greenhouse Gas Inventory for a Global Oil and Gas Company
Geosyntec was engaged by a global oil and gas client to develop a corporate greenhouse gas (GHG) emission inventory incorporating ...

Air Permitting and Regulatory Analysis
A toy production company planned to build a new manufacturing facility in the United States in the Richmond, Virginia, area ...

Environmental Compliance for an Airport Equipment Manufacturer
This project addressed several environmental gaps identified during ownership transition at a facility that manufactures aviation ground equipment. The facility ...





