Featured Projects
Read about our exemplary projects to learn how our consultants work across regions, practices, and markets to deliver exceptional solutions, without exception.
All Projects
Coastal & Waterfront
Twin Rivers Park, Martin County, Florida
ATM, a Geosyntec Company, designed, permitted, and monitored the construction of a living shoreline, shoreline stabilization, and passive park-enhancement project ...
Coastal & Waterfront
Christophe Harbour Marina, St. Kitts, West Indies
Geosyntec, conducted numerous coastal and marina-related studies for a state-of-the-art megayacht marina and marina village as part of the Christophe ...
Coastal & Waterfront
Municipal Marina Redevelopment, Isle of Palms, South Carolina
After purchasing its municipal marina two decades before work began, the City of Isle of Palms recognized that the facility's ...
Coastal & Waterfront
Rodney Bay Marina, St. Lucia, Lesser Antilles
ATM, a Geosyntec Company, planned and managed a comprehensive marina redevelopment with berthing for 32 megayachts up to 250 feet ...
Coastal & Waterfront
Florida Department of Transportation Statewide Water-Quality Services
ATM, a Geosyntec Company, has provided comprehensive statewide total maximum daily load (TMDL), basin management action plan (BMAP), water quality, ...
Coastal & Waterfront
Dubai Marina District Facilities, Dubai, United Arab Emirates
Since 2007, ATM, a Geosyntec Company, has provided full marina design, engineering, and consulting services for the installation of flagship ...
Coastal & Waterfront
Ritz Carlton Resort Marina and Mangrove Design, Grand Cayman, Cayman Islands
ATM, a Geosyntec Company, developed marina plans and innovative mangrove design concepts for a new resort along the North Sound ...
Coastal & Waterfront
Yacht Haven Grande Megayacht Marina, St. Thomas, United States Virgin Islands
Located next to the cruise terminals in St. Thomas Harbor, the Yacht Haven Grande facility was designed to become a ...
Water and Natural Resources
National Physical Sustainable Development Plan, Turks and Caicos Islands
ATM, a Geosyntec Company, provided technical assistance in coastal and marine engineering and coastal resiliency to create a 10-Year National ...
Coastal & Waterfront
Jekyll Island Oceanfront Shoreline Rehabilitation, Jekyll Island, Georgia
ATM, a Geosyntec Company, provided full-service planning, public outreach, engineering, design, permitting, bidding, and construction administration support on the rehabilitation ...
Coastal & Waterfront
Lee County Continuing Water Quality Services, Lee County, Florida
ATM, a Geosyntec Company, has been providing water quality-related technical assistance to Lee County since 2007 and continues to do ...
Coastal & Waterfront
Palm Jumeirah Marina, Dubai, United Arab Emirates
The Palm Jumeirah Marina is the first and largest marina facility on Palm Jumeirah, and one of the largest in ...
Coastal & Waterfront
Dubai Harbour Seawater Intake and Outfall System, Dubai, United Arab Emirates
Dubai Harbour is a waterfront development that includes the largest marina in the Middle East. This exclusive, mixed-use development features ...
Coastal & Waterfront
Municipal Seaplane Base and Marina, City of Tavares, Florida
The existing seaplane base and marina located in the Harris Chain of Lakes in Tavares, Florida, were destroyed during the ...
Coastal & Waterfront
Atlantic Beach Coastal Hazard Assessment, Atlantic Beach, Florida
As part of a multidisciplinary team, ATM, a Geosyntec Company, conducted the coastal hazard assessment component of a coastal vulnerability ...
Coastal & Waterfront
San Sebastian River Resiliency Assessment, St. Johns County, Florida
As part of a multidisciplinary team, ATM, a Geosyntec Company, conducted a study for St. Johns County to evaluate future ...
Coastal & Waterfront
NASA Kennedy Space Center Infrastructure Study, Brevard County, Florida
Before this project began, the National Aeronautics and Space Administration's (NASA's) Kennedy Space Center participated in a previous preliminary vulnerability ...
Coastal & Waterfront
NASA Kennedy Space Center Dune Restoration, Brevard County, Florida
As part of a multidisciplinary team, ATM, a Geosyntec Company, provided engineering design services to restore approximately 3.7 miles of ...
Geotechnical
Scotts Peak Dam Upstream Geomembrane Seismic Upgrade
Scotts Peak Dam is located on the Huon River in Tasmania, Australia and impounds Lake Pedder, one of a series ...
Geotechnical
Sites Reservoir Project – Alternatives Analysis and Feasibility-Level Design of Regulating Reservoir
The Sites Reservoir Project includes a new 1.5 million-acre-feet reservoir to be situated within the eastern margin of the California ...
Geotechnical
USACE Dam and Levee Construction and Rehabilitation Information Management
The United States Army Corps of Engineers (USACE) owns, operates, and maintains more than 700 dams and associated structures. Some ...
Geotechnical
Power Utility On Call Dams Safety Support Services
Geosyntec serves a power utility company that provides electricity to a large population covering a territory of tens of thousands ...
Contaminated Sites
Orlando Former Gasification Plant, Operable Unit 1
Historical operations of a manufactured gas plant (MGP) in Orlando, Florida from ~1887 to 1959 resulted in the release and ...
Contaminated Sites, Environmental Management
Site Assessment and Remediation Southern California
The project involved the assessment and rapid remediation of a former electrical component and aerospace manufacturing site where previous investigations ...
Contaminated Sites, Environmental Management
Nammo Talley Groundwater and Soil Perchlorate Remediation System
Nammo Defense Systems, Inc. (Nammo Defense) is an aerospace and defense company that is one of the world’s leading providers ...
Contaminated Sites
Jet Injection of Zero Valent Iron into Fine-Grained Formations Pilot Test Demonstration
Manufacturing of synthetic resins at a former chemical manufacturing facility left groundwater in shallow, fine-grained lithologic units impacted with volatile ...
Contaminated Sites
In Situ Remediation of CVOCs in Low-Permeability Zones
East Carolina University (ECU) purchased a former dry cleaner property as the prospective site of a new Life Sciences and ...
Contaminated Sites
Soil Vapor Extraction Chlorinated VOC Remediation
The former Athanor Group, Inc. facility in Southern California had a historical release of volatile organic compounds (VOCs), primarily tetrachloroethene ...
Contaminated Sites
Soil and Groundwater Treatment System Optimization
Releases of chlorinated solvents from a manufacturing facility resulted in a groundwater plume extending offsite. Multiple treatment systems were installed ...
Contaminated Sites
Mixed NAPL Source Area Investigation and Alternative Groundwater Remedy at the Cortese Landfill NPL Site
The Cortese Landfill NPL Site is an unlined landfill that received municipal and industrial wastes. Previous consultants completed the RI/FS, ...
Industrial Wastewater Discharge Optimization and Waste Management Services
Geosyntec was engaged by a citrus juice production client that operates a fresh food production facility in Los Angeles County ...
Industrial Wastewater Management
The Los Angeles County Metropolitan Transportation Authority (Metro) owns and operates several bus washing facilities within the transportation tunnel in ...
St. Simons Island Shoreline Restoration
Geosyntec practitioners provided planning, public coordination, engineering, design, regulatory permitting, and construction-phase services for the rehabilitation of approximately 9,300 linear ...
Holden Beach Coastal Engineering Consulting Services
Since 2001, Geosyntec has served as the on-call coastal engineering consultant for Holden Beach, North Carolina, providing specialized expertise to ...
Continuing Comprehensive Engineering Services for Municipal Parks and Waterfront Structures
Since 2001, Geosyntec has supported the City of Jacksonville’s inland and waterfront projects ...
Hudayriyat Island Modeling: Campsite Beach, Cove Marina, Laguna Beach, and Overwater Villas
ATM, a Geosyntec Company, has been supporting MODON since 2017 on Hudayriyat Island, a reclaimed landmass adjacent to Abu Dhabi’s ...
Ahmed Bin Rashid Port Dredging and Umm Al Quwain Beach Land Reclamation
ATM, a Geosyntec Company, was appointed by the Government of Umm Al Quwain (UAQ) to conduct maintenance dredging of the ...
Boca Raton Comprehensive Coastal Engineering Services
ATM, a Geosyntec Company, has been providing the City of Boca Raton with comprehensive coastal engineering services under continuing services ...





