Featured Projects
Read about our exemplary projects to learn how our consultants work across regions, practices, and markets to deliver exceptional solutions, without exception.
All Projects
No posts found.

Operation and Optimization of a Multi-Component Groundwater Treatment Remedy
A residual DNAPL source area (total VOC concentrations as high as 25,000 to 30,000 g/L) is located in weathered bedrock ...

Malvern TCE Superfund Site
A site in East Whiteland Township, Chester County, Pennsylvania operated as a solvent reclamation facility from 1952 to 1992. A ...

Detailed Site Assessment and Long-term Management Strategy for a Nitrobenzene DNAPL Impacted Site
Historical nitrobenzene production operations resulted in nitrobenzene dense non-aqueous phase liquid (DNAPL) impacts at depth within a stratified alluvial aquifer ...

Groundwater Remedy for a Closed CKD Pile Site
A cement plant operated for close to nine decades on a remote location before production activities ceased and the plant ...

Enhanced In-Situ Bioremediation at a Former Manufacturing Facility
The owner of a former manufacturing facility in central Indiana needed to evaluate the performance of Enhanced In-Situ Bioremediation (EISB) ...

Flagler Memorial Bridge Micropile Underpinning of Bascule Piers
The aging Flagler Memorial Bridge suffered from detrimental settlement caused by vibratory installation of steel drilled shaft casings for a ...

Barge Decommission, Dismantle and Dispose Project
The U.S. Army Corps of Engineers (USACE) awarded a $35 million contract to decommission, dismantle, and dispose a nuclear reactor ...

AGE Biomass Renewable Energy Plant
DCO Energy, LLC (DCO), was the design-build contractor for the $200M, 50 MW AGE Biomass Renewable Energy Plant in Albany, ...





