Site Investigation at a Closed Manufacturing Facility Lomazzo, Italy
This manufacturing facility in Lomazzo, Italy was originally developed in the 1930s as a factory for manufacturing shoe-making tools, and ...

Contaminated Sites
Bioaugmentation Pilot Test for Chlorinated Solvent Impacts in Sweden
High levels of the chlorinated solvents tetrachloroethene (PCE) and trichloroethene (TCE) occur in groundwater beneath a manufacturing facility in southern ...

Contaminated Sites
Feasibility Study and Treatability Testing for a Shoreline Site Impacted by Pharmaceutical Manufacturing Wastes in Denmark
Kærgård Plantage is one of the most widely publicized contaminated sites in Denmark, and is often referred to as a ...

Contaminated Sites
Development of National Guidance Manual on Bioavailability Assessment in Sweden
Risk assessment at contaminated sites in Sweden currently follows a methodology that includes the use of guideline values, which are ...

Contaminated Sites
In Situ Bioremediation of Trichloroethene and Hexavalent Chromium in Denmark
Trichloroethene (TCE) and hexavalent chromium (CrVI) have impacted shallow groundwater beneath an active manufacturing facility in Svendborg, Denmark. The site ...

Contaminated Sites
Biostimulation and Bioaugmentation for Passive In Situ Remediation of Chlorinated Solvents in Denmark
Groundwater beneath a former manufacturing facility in a small Danish town is contaminated with part-per-million levels of trichloroethene (TCE) and ...

Contaminated Sites
Brownfield Redevelopment for Home Depot in Burbank, California
Geosyntec was contracted for the redevelopment of a former defense manufacturing facility into a Home Depot store and garden center ...

Contaminated Sites, Environmental Management
Site Investigation of a Closed Manufacturing Facility in France
An appliance controls manufacturing facility in Thyez, France was active in industrial activities from the 1960s until 2007. Operations at ...

Geotechnical, Water & Wastewater
Design and Permitting for Closure of a Fly Ash Reservoir High Hazard Dam Modification
Geosyntec's client, a power plant in Ohio, generates electricity from two, 1,300-MW, coal-fired units. In anticipation of upcoming federal coal ...

Geotechnical, Waste Management
Foundation Design for Rail Line Extension Atop Closed Coal Ash Pond
Brunner Island is a three-unit, coal-fired plant owned by PPL Generation, Inc., and located on the west bank of the ...

Civil Sites, Waste Management
Slope Remediation Strategy and Implementation at a Fly Ash Disposal Basin
The project site is a nearly 400-acre fly ash disposal basin for a very large, coal-fired electricity generating facility in ...

Civil Sites, Water & Wastewater
Design and Implementation of Nickel IWW Treatment to Reduce Groundwater Impact
Geosyntec was retained by Progress Energy Florida, now Duke Energy, to prepare a corrective action plan to address nickel impacts ...

Waste Management
Coal Combustion Residuals Pond Closure Guidance Documents
In December 2008 a slope stability failure at a fly ash disposal facility in the United States caused significant environmental ...

Contaminated Sites, Waste Management
Site Characterization Studies for Two Coal Combustion Byproduct Storage Facilities
Coal combustion byproducts (CCBs), though not considered hazardous waste under the Resource Conservation and Recovery Act, have the potential to ...

Civil Sites, Contaminated Sites
Rapid Assessment and Removal of Coal Combustion Products JEA St. Johns River Power Park Area II Landfill
The JEA St. Johns River Power Park is a 1,260-MW coal and petroleum coke fired power plant located in Jacksonville, ...

Contaminated Sites, Geotechnical, Waste Management
Coal Combustion Residuals Management Plans – Kingston Fossil Plant
Geosyntec has had a strong and continuous involvement in engineering projects at TVA Kingston since the 2008 geotechnical failure. Our ...

Geotechnical, Waste Management, Water & Wastewater
Design and Permitting for Coal Combustion Residuals Requirements and Effluent Limitation Guidelines
Geosyntec provided comprehensive services to Santee Cooper at the Winyah Generating Station to assist the facility with compliance with the ...

Air Quality, Contaminated Sites, Environmental Management
Continuous Measurement of Flue Gas SO3 Concentrations for Real-Time Monitoring of Process Changes
Geosyntec was asked to devise a measurement method that would accurately determine coal-fired power plant flue gas concentrations of sulfur ...

Air Quality, Contaminated Sites, Environmental Management
Evaluation of Process Monitors and Mercury Mitigation Technologies to Reduce Mercury Stack Emissions
In preparation for compliance with the US EPA Mercury and Air Toxics Standards (MATS), our utility client needed a robust ...

Air Quality, Environmental Management
Sulfur Trioxide and Sulfuric Acid Flue Gas Testing
Geosyntec’s client, a large Eastern utility, plans to burn higher sulfur coals in the future, and the fuel change has ...

Water and Natural Resources
Emergency Action Plan Flood Inundation Project for the Tennessee Valley Authority (TVA)
Tennessee Valley Authority (TVA) River Operations regulates a system of 49 reservoirs spanning seven states and maintains Emergency Action Plans ...

Contaminated Sites, Waste Management
Design and Permitting of a Flue Gas Desulfurization Residuals Waste Landfill Over an Existing Ash Pond
An American Electric Power plant in Ohio generates electricity from two, 1,300-MW, coal-fired units. The client's objective for the project ...

Contaminated Sites
Marsh Sediment Removal Action and Ecological Risk Assessment, Brunswick, Georgia
The LCP Chemicals Site is among the most complex CERCLA remediation projects in U.S. EPA Region 4. Past site operations ...

Contaminated Sites, Geotechnical
Design and Build of Shoreline Sheet Pile Wall for Groundwater Flow Control
Tesoro Alaska Petroleum Company has an oil refinery in Kenai, Alaska, on a bluff approximately 100-feet above the shores of ...

Waste Management
Onsite Disposal Facility for Low-level Radioactive Wastes from Fernald D&D Program
The Feed Production Center at the Fernald site was a uranium processing plant under the Atomic Energy Commission and operated ...

Contaminated Sites
Sediment-Related Projects at a Gas-Fired Energy Plant, Port Washington, Wisconsin
Geosyntec has provided consulting services to We Energies on several sediment removal projects at their Port Washington Generating Station (PWGS), ...

Geotechnical
Dam Safety Reviews and Potential Failure Mode Analysis
The Santa Clara Valley Water District's Dam Safety Review Project (DSRP) is provides an independent safety review and evaluation of ...

Contaminated Sites
Public Health Risk Assessment in Support of Use Attainability Analysis in Chicago Waterways
The Chicago Waterways System (CWS) offers an array of recreational opportunities for the community. The Illinois Environmental Protection Agency (IEPA), ...

Water and Natural Resources
Shawsheen River Interactive Recreational Map
The Shawsheen River winds for about 25 miles through all or parts of 12 communities in northeastern Massachusetts before emptying ...

Coastal & Waterfront, Waste Management
Innovative Landfill Foundation Improvement Technique at the Cherry Island Landfill Allows a Major Vertical Expansion
The Cherry Island Landfill (CIL) is located in Wilmington, New Castle County, Delaware at the confluence of the Delaware and ...

Environmental Permitting for Linear Submerged Cable Replacement and Engineering Design and Oversight
Geosyntec was retained by an oil corporation to permit the replacement of the electrical system powering a corporate retreat located ...

Environmental and Management System Support
Arch Resources (Arch) is a leading U.S. producer of metallurgical products for the global steel industry, and the leading supplier ...

Confidential Utility Client Environmental Liability Valuation of MGP Liability
Geosyntec was retained through outside counsel for a gas utility client to provide a probabilistic valuation of potential environmental liabilities ...

Environmental Liability Valuation for Automobile Parts Manufacturer Site Portfolio
Geosyntec was retained as part of a multi-disciplinary team by an international automobile parts manufacturer to pursue settlement on environmental ...

Environment Social and Governance Program Support for an Energy Company
An innovative energy company that creates lower carbon fuel is committed to making environmental gains and sustainable returns for their ...

Energy Utility Company’s ESG Reporting and Carbon Strategy Project
An energy utility company required support with environmental, social, and governance (ESG) reporting and performance metrics, carbon strategies, and legislative ...

Geotechnical Site Investigation for Bay State Wind Offshore Wind Farm Cable Route
Orsted was granted a commercial renewable energy lease within a 760-square-kilometer area to build and operate the Bay State Wind ...

Comprehensive ESG and Sustainability Program Support for an Energy Company
Geosyntec was engaged by a midstream energy company committed to transparency and disclosure of its environmental, social and governance (ESG) ...