Featured Projects
Read about our exemplary projects to learn how our consultants work across regions, practices, and markets to deliver exceptional solutions, without exception.
All Projects

Water & Wastewater
San Gabriel Valley Groundwater Project Intermediate Zone Interim Remedy
The Main San Gabriel Basin has been the subject of environmental investigation since 1979 when volatile organic compounds were first ...

Water & Wastewater
PH Control Wastewater Treatment System Design and Permitting Assistance
A pharmaceutical client's industrial wastewater pre-treatment system was not meeting discharge limits for pH. Geosyntec provided technical support for a ...

Geotechnical
Geotechnical and Water Quality Instrumentation Installation and Monitoring
Geosyntec installed solar powered water quality monitoring units at the Center Hill Dam to wirelessly transmit construction and other data ...

Contaminated Sites
Electrokinetic (EK) Enhanced In Situ Bioremediation EK-BIO(TM) Field-Scale Technology Demonstration
US Department of Defense (DoD) has estimated significant cost savings are possible through the application of accelerated source treatment technologies ...

Contaminated Sites, Environmental Management, Water and Natural Resources
Tiawasee Creek Watershed Management
The Alabama Department of Environmental Management has included the entire length of Tiawasee Creek and one of the unnamed tributaries ...

Geotechnical
Fossil River Reach Thermal Model Updates
The Tennessee Valley Authority (TVA) manages a large system which includes fossil and nuclear plants, dams and reservoirs. TVA uses ...

Water & Wastewater, Water and Natural Resources
Lower Buttermilk Creek Bank Stabilization Project
The City of Austin retained Geosyntec to stabilize approximately 450 linear feet of eroding stream bank along lower Buttermilk Creek ...

Waste Management
Residential Recycling Composition Study
Recycling is a component of their franchise hauling agreement with three regional collection service providors. Due to market changes resulting ...

Waste Management
Solid Waste Management and Recycling Study
Frederick County, Maryland operates an integrated solid waste management system that manages over 175,000 tons of solid waste annually within ...

Waste Management
Feasibility Assessment and Conceptual Design: Decentralized Program for Composting Source-Separated Organics
Frederick County, Maryland operates an integrated solid waste management system that manages over 175,000 tons of solid waste annually. Although ...

Waste Management
Solid Waste Management Planning Services
Dorchester County, Maryland was faced with severe cash flow problems and probable landfill closure resulting from regulatory compliance issues and ...

Waste Management
Integrated Solid Waste Operations Review and Assessment
The Solid Waste Authority of Central Ohio (SWACO) manages over a million tons of solid waste annually through an integrated ...

Waste Management
Waste Composition Studies in Support of Fuel Pellet Production
Geosyntec provides a wide range of technical services associated with determining the feasibility of emerging technologies, including field studies, literature ...

Waste Management
Review and Update of the Facility Master Plan Central Landfill
Geosyntec was retained by Cecil County, Maryland to provide guidance on updating the county's existing Solid Waste Management Plan (SWMP), ...

Contaminated Sites
TCE Source Area Remedial Design
The Paducah Gaseous Diffusion Plant (PGDP), located in western Kentucky, is a former uranium enrichment facility owned by the U.S ...

Contaminated Sites
Remediation of Agricultural Chemicals in Groundwater
Chemicals of concern (COCs) at the site are primarily nitrate and pesticides that no longer have active registration in the ...

Water and Natural Resources
Agricultural Best Management Practices (BMP) Database Design
The Water Environment Research Foundation (WERF) and the National Corn Growers Association (NCGA) have initiated a collaborative effort to develop ...

Contaminated Sites
Environmental Site Assessment and Compliance Services Aid the Acquisition of an Agricultural Chemical Facility
As part of a potential business acquisition, an agricultural chemical distributor retained Geosyntec to perform Phase I and Phase II ...

Environmental Management, Water & Wastewater
Industrial Stormwater Pollution Prevention Plan (SWPPP) Support
Geosyntec provided assistance to Wilbur-Ellis in support of the preparation of industrial stormwater pollution prevention plans (SWPPPs) for their Wenatchee ...

Water & Wastewater
McAnally Chicken Ranch Egg Processing Facility Wastewater and Stormwater Management
McAnally Egg Enterprises was interested in relocating their existing egg laying and processing facility to a new, previously undeveloped site ...

Geotechnical
Geotechnical Engineering and Construction Services at Red Dog Mine
Red Dog Mine is one of the world's largest zinc mines, located in the remote Northwest Arctic Borough of Alaska ...

Water & Wastewater
Wastewater Treatment Assessment of Options
The local municipality's wastewater treatment system requires upgrades to achieve long-term compliance with the Province of Manitoba's Nutrient Management Strategy ...

Contaminated Sites
Remediation using Large Diameter Auger with Steam and Zero Valent Iron
Tetrachloroethylene (PCE) concentrations in groundwater in the source zone of a former syringe manufacturer were indicative of dense non-aqueous phase ...

Civil Sites, Geotechnical
Geotechnical Monitoring for the Replacement of the Chickamauga Lock
The Chickamauga Lock is a navigation lock on the Tennessee River, seven miles upstream of Chattanooga. Because the existing 80-year-old ...

Environmental Management
Municipal Climate Change and Natural Hazard Vulnerability Assessment in Massachusetts
The need for municipalities, regional planning organizations, states, and federal agencies to increase resilience and adapt to extreme weather events ...

Contaminated Sites
Tidal Salt Marsh Restoration for Elba Island, Georgia
For two decades, Geosyntec has been working with Kinder Morgan's subsidiary, Southern LNG Company, LLC (SLNG) to provide engineering support ...

Contaminated Sites
Wetlands Restoration for Bolsa Chica in Orange County, California
The Bolsa Chica site is approximately 1,200 acres of degraded coastal wetland that has been affected by oil field activities ...

Waste Management
Sea Level Rise, Storm Surge Analysis, and Protection Design for Malone Superfund Site in Texas
The Malone Services Company Superfund Site is situated in a lowland area along Galveston Bay, Texas bordered by open water ...

Water & Wastewater
Estuary Assessment and Delineation Project for Massachusetts Bays Program
Geosyntec's work focused analyzing and prioritizing the nearshore estuaries and embayments by delineating the 47 estuarine watershed boundaries, encompassing all ...

Water and Natural Resources
Los Angeles River Master Plan Update
The Los Angeles River (LA River) is one of Los Angeles County, California's most valuable assets, providing flood risk management ...

Holistic Due Diligence, Environmental, Health, and Safety Compliance
Lantmännen, an agricultural cooperative and Northern Europe’s leader in agriculture, machinery, bioenergy, and food products, retained Geosyntec to undertake our ...

Environmental Due Diligence Phase I ESA and Phase II GI for a Complicated Target Site Dating from 1777
Geosyntec was retained by a major food and beverage process engineering and machinery manufacturer to undertake environmental due diligence; the ...

Due Diligence and Environmental Compliance Services at Manufacturing and Maintenance Facilities
Geosyntec’s client is one of the world’s largest manufacturers of diesel engines, diesel and natural gas generators, and diesel-powered refrigeration ...

Comprehensive Environmental Management Support for River Birch Landfill
Geosyntec has provided comprehensive environmental compliance and other consulting services to River Birch since 2017 ...

Design/Build for Railroad Repairs, United States Army Corps of Engineers Norfolk District
This design/build project for the United States Army Corps of Engineers (USACE), Norfolk District, at Fort Eustis in Virginia replaced ...

Environmental Due Diligence and Site Redevelopment, Former Concord Naval Weapons Station
Geosyntec Consultants was retained by the Master Developer to conduct environmental due diligence and assist our client in transferring property ...

Low-Head Dam Removal
A low-head dam, originally constructed in the 1800’s, was scheduled for removal in order to increase free movement of aquatic ...

Design and Permitting for the Breaching of R. Paul Smith Power Station Dam #4
The R. Paul Smith Power Station is a retired coal-fired power station located along the left bank of the Potomac ...