Geosyntec Consultants Logo

Information Managment

Confidential Client Database and Compliance Reporting

2026-04-02T16:49:11-06:00March 3rd, 2025|

Geosyntec is working with a confidential client to organize, manage, and respond to the various regulatory orders for a site in Northern California. This includes managing and tracking the groundwater monitoring programs, handling compliance reporting, managing the project database, and conducting quality assurance and quality control. We are also developing data querying, reporting, and interfacing tools for project stakeholders.

Data Consolidation and 3D Visualization Landfill Gas System Optimization

2026-03-08T09:17:06-06:00February 4th, 2025|

The Riverbend Landfill is an active landfill with eight existing modules. Since 2010, Geosyntec has provided consulting services for many aspects of operations at the landfill. Waste Management (WM) sought the consolidation and incorporation of preconstruction, design, and as-built data into a three-dimensional (3D) model to visualize its current gas-well network and assist in the efficient and cost-effective placement of new gas extraction wells.

East St. Louis Deep Cutoff Wall Installation and Flood Mitigation Project

2026-05-25T14:06:18-06:00November 22nd, 2024|

The United Sates Army Corps of Engineers (USACE), through Bauer Foundation Corp. (Bauer), is leading a slurry wall construction installation through a mainline Mississippi River levee in East St. Louis, Illinois. According to the USACE, without this deficiency-correction project, the levee is in danger of failing due to under-seepage or through-seepage during flood events. The deep wall construction is accomplished using a combination of clam shell and hydrocutter excavation. The wall panel construction extends up to 140 feet below the levee toe.

68th Street Dump Superfund Site Remote Sensing and Spatial Analysis for Construction Monitoring and CQA

2026-05-26T06:58:12-06:00November 22nd, 2024|

The 68th Street Dump is a USEPA Superfund Site in a mixed-use area in and abutting Baltimore, Maryland. The 239-acre site includes seven historical landfills as well as streams, ponds, and wetlands. The remedy selected in the Record of Decision included soil cover systems on four disposal areas, two leachate-collection trenches, light nonaqueous-phase liquid (LNAPL) recovery, enhanced wetlands, stream bank stabilization, soil and sediment excavation, deep-rooted vegetation, a biowall, surface-debris removal, passive landfill-gas venting, access barriers, and several additional natural-resource damage-restoration projects. Geosyntec and our natural-resource-design partner, Straughn Environmental, Inc., prepared the Remedial Design between 2018 and 2022. Since 2023, Geosyntec has served as the Supervising Contractor and Resident Engineer, providing construction monitoring, construction quality assurance, and construction-phase engineering services during remedial action (RA) construction.

Go to Top