Geosyntec Consultants Logo

United States

Technical Consultant Services as Part of an Ecological Water Resources and Assessment Project

2026-04-06T13:02:10-06:00October 27th, 2009|

The Missouri Department of Natural Resources (MDNR) identified science-based policy analysis as a key administrative objective following a Federal review of Missouri's Water Quality Standards Program in 2000. U.S. EPA Region 7 selected the Environmental Resources Coalition (ERC) to administer an Ecological Water Resources and Assessment Project (EWRAP) grant to assist MDNR in developing a science-oriented approach. ERC selected Geosyntec to be the lead technical consultant for ERC and MDNR.

Site-Specific Dissolved Oxygen Criteria and Wasteload Allocation Modeling Study

2026-04-06T09:20:49-06:00October 27th, 2009|

The City of Blue Springs (City) is in need of additional infrastructure to accommodate growing wastewater needs as development progresses around the Kansas City metropolitan area. To accommodate anticipated growth, the City is planning an expansion and upgrade to their current wastewater treatment facility (WWTF), which discharges into Sni-A-Bar Creek. Perennial reaches of Sni-A-Bar Creek are included in Missouri's impaired waters list due to low dissolved oxygen (DO) concentrations. Geosyntec and agency scientists believed that Sni-A-Bar Creek did not attain statewide DO criteria naturally during summer conditions as a result of shallow depths, high residual sediment oxygen demand, low reaeration, and transient stagnant features such as beaver dams and backwater areas. To permit expansion of a WWTF that discharges to impaired reaches, state regulatory policies require intensive water quality study and evaluation of attainable conditions. HDR | Archer Engineers retained Geosyntec on behalf of the City of Blue Springs to evaluate water quality conditions within this basin, develop site-specific dissolved oxygen targets, and perform water quality modeling to assist in wastewater planning and permitting efforts.

Pier G Wharf Loading System Upgrade and Pile Driving CQA – Port of Long Beach

2026-06-16T14:30:11-06:00October 27th, 2009|Tags: |

To accommodate for a new, heavier shiploader, the existing Pier G wharf in Port of Long Beach, California had to be upgraded to increase speed and capacity The design called for a moment resisting space frame to be constructed within the existing wharf footprint, yet independent of the existing structure.

Vapor Intrusion Assessment and Innovative Technologies Help Reduce Long-Term Liabilities

2026-08-14T14:16:22-06:00October 27th, 2009|Tags: |

The Raritan Arsenal was used by the U.S. Army from World War I until the 1960s as an ammunition storage and renovation facility. It has since been redeveloped and reoccupied for multi-unit commercial use. There are chlorinated solvents in groundwater at the Site, which are being monitored and remediated. The New Jersey Department of Environmental Protection (NJDEP) requested an assessment of subsurface vapor intrusion into indoor air and required the U.S. Army Corps of Engineers (Corps), now responsible for Site cleanup actions, to conduct extensive sub-slab and indoor air monitoring. Three years of monitoring data repeatedly showed detectable concentrations of volatile organic compounds (VOCs) in groundwater, soil gas and indoor air samples, interpreted by the NJDEP as a complete exposure pathway despite indications of interior sources for both tetrachloroethene (PCE) and trichloroethene (TCE). Repeat sampling of groundwater, sub-slab soil gas and indoor air by the previous consultant simply confirmed detections of PCE and TCE in all three media. Prior to the NJDEP issuing an Order for expensive mitigation, the Corps retained Geosyntec through Shaw Environmental (Shaw) to review historic data, provide an independent interpretation, and conduct a single phase of data collection to resolve once and for all the relative contributions of vapors from sources inside the building versus any contribution of vapors from the subsurface, and refine the mitigation program to an appropriate level.

Post-Fire Emergency Flood/Erosion Protection for the County of San Diego

2026-06-16T14:30:02-06:00October 27th, 2009|Tags: |

Nearly four years after the historic 2003 wildfires devastated San Diego County, strong, shifting Santa Ana wind conditions, combined with high temperatures, low humidity, and multiple years of drought combined to create the perfect conditions for fast spreading wildfires in 2007. The 2007 fire season saw approximately 500,000 acres burned within Southern California, with over 340,000 acres within San Diego County alone, destroying over 2,300 structures and several people losing their lives. With winter rains fast approaching, the County of San Diego faced the potential for devastating mudslides and debris flows that could inundate thousands of homes, close evacuation routes, and cause significant environmental damage. Using Geosyntec's 2003 Post-Fire hazard response as a model, personnel from the County and Geosyntec initiated an Emergency Flood / Erosion Protection Program that first assisted homeowners in protecting their property, then stabilized watersheds to reduce mudslides and debris flows.

Effectiveness of Environmentally Sensitive Site Design and Low Impact Development on Stormwater Runoff Patterns

2026-06-16T14:30:20-06:00October 27th, 2009|

In order to understand, and possibly mitigate, observed reductions in water flow throughout the Ipswich River Watershed, the Massachusetts Department of Conservation and Recreation (DCR), using funds from a U.S. EPA Targeted Watershed Grant, retained Geosyntec to evaluate the impacts of stormwater flow using Low Impact Development (LID) stormwater management design techniques. Geosyntec designed the study to contrast the stormwater runoff patterns of well-documented conventional development stormwater management with the real-world application of environmentally sensitive site design and LID principles, thus determining the degree to which stormwater runoff is reduced in a new housing development compared to an existing conventional development. The results of this state-of-the-practice comparison would allow communities and developers to assess the effectiveness of the design types and create benchmarks for LID stormwater management. The immediate goal was to help improve groundwater base flow and develop a scientifically-based, reliable stormwater model to aid in other future LID designs within the Ipswich River Watershed. Careful lot-by-lot delineation of drainage and a complete understanding of the flow paths during rainfall events was critical for the success of this project. Partridgeberry Place, a recent residential development, was chosen as the evaluation site.

Port of Los Angeles Vacuum Consolidation Technology Demonstration

2026-06-16T14:30:12-06:00October 27th, 2009|Tags: |

The Port of Los Angeles sought a field test of vacuum-assisted preconsolidation of hydraulic fill to assess the feasibility of this technology as an alternative or supplement to conventional surcharge techniques for ground improvement of future hydraulic fill sites at the Port.

Herbert Hoover Dike Rehabilitation Reach 1 Seepage Cutoff Wall at Lake Okeechobee, Florida

2026-04-02T14:30:47-06:00October 27th, 2009|Tags: , |

The Herbert Hoover Dike (HHD) rehabilitation project is designed to stabilize and secure the aging dike from potentially damaging severe weather events, and protect the numerous residents and businesses on the southeastern rim of Lake Okeechobee. In 2007, the U.S. Army Corps of Engineers (USACE) placed the HHD on the Top 10 list (at No. 6) of dams in the nation needing repair. The USACE Jacksonville District prioritized rehabilitation of segments that were identified as most vulnerable, focusing initial efforts on achieving the most significant impacts.

The cutoff wall, a critical design feature in the dike rehabilitation, will minimize existing internal erosion, known as "piping," and prevent further damage to the internal structure of the dike. A 22-mile stretch from Port Mayaca south to Belle Glade that is considered the most vulnerable section of the 143-mile dike is the first wall section to be built. The work began in 2008 and is scheduled for completion in 2012. In May 2008 the USACE Jacksonville District selected Bauer Foundation Corp. (BFC) for the first of four (4) major task orders to construct a total of 10 -miles of the planned cutoff wall that runs vertically from the dike crest to a depth of nearly 80 feet in certain locations. BFC selected Geosyntec as part of its team to provide construction quality control/quality assurance services, geotechnical engineering support, environmental protection monitoring, subsurface barrier construction consultation, and provide additional technical resources related to dam and levee rehabilitation.

Full-Scale Bioremediation of Chlorinated Solvents in Groundwater at Six Sites

2026-04-06T11:36:38-06:00October 27th, 2009|Tags: , , , |

The Aberdeen Area at Aberdeen Proving Ground (APG-AA) has operated as an ordnance proving ground since 1917, and throughout its history has been the site of testing of conventional weapons, ammunition, armored vehicles, and other equipment. During a previous Remedial Investigation, chlorinated solvents were identified in groundwater at six sites within APG-AA, collectively known as Other Aberdeen Areas (OAA). The primary contaminant of concern at all six sites is trichloroethene (TCE); however, 1,1,1-trichloroethane (1,1,1-TCA) has also been identified at some sites. The Army's objective for the OAA sites was to rapidly identify, design, build, and implement cost-effective remediation systems that will meet interim remediation goals within five years and drinking water standards within 30 years.

Preliminary TMDL and Nonpoint Source Pollution Assessment of Coastal Areas in Southern Massachusetts

2026-06-16T14:30:14-06:00October 27th, 2009|

Section 303(d) of the Clean Water Act requires states to list water bodies as "impaired" if they do not meet one or more of a defined list of water quality standards. It also requires the states to determine Total Maximum Daily Loads (TMDLs) for the pollutant(s) in each impaired water body that are contributing to the impairment. TMDLs determine the amount of a pollutant that a water body can safely handle without violating water quality standards.In 2001, the Massachusetts Department of Environmental Protection (MassDEP) classified 32 ponds and stream segments as "impaired" under Section 303(d) in the towns of Plymouth, Kingston, and Pembroke in southeastern Massachusetts. These towns fall within the state's South Coastal watershed. Many of these water bodies were impaired due to noxious aquatic plants, but other pollutants included metals, turbidity, bacteria, and nutrients.The regional watershed coordinator with the MassDEP for the South Coastal watershed identified the need to conduct a further investigation of the 32 listed water bodies to assess the nature of the pollution problems and to identify which water bodies were in most need of attention.

Go to Top