Geosyntec Consultants Logo

United States

Public Health Risk Assessment in Support of Use Attainability Analysis in Chicago Waterways

2026-04-06T13:02:51-06:00October 27th, 2010|Tags: , |

The Chicago Waterways System (CWS) offers an array of recreational opportunities for the community. The Illinois Environmental Protection Agency (IEPA), in compliance with the Clean Water Act, is currently conducting a Use Attainability Analysis (UAA) on the CWS. One aspect of the UAA is to determine whether bacterial water quality standards for some or all of the CWS are necessary to protect the proposed designated uses of the CWS. In order to assist IEPA in making its determination, the Metropolitan Water Reclamation District of Greater Chicago (District) selected Geosyntec to conduct a risk assessment of the human health impacts of instituting effluent disinfection at its three largest water reclamation plants (WRP), which include the Stickney WRP, the North Side WRP, and the Calumet WRP, all of which discharge into the CWS.

Silver Lake LID Demonstration Project

2026-04-06T13:24:08-06:00October 29th, 2009|

Silver Lake, in the northern suburbs of Boston, is heavily used for recreational purposes such as swimming, fishing, wildlife viewing, and boating. However, the lake is degraded from nutrients, sediment, and bacteria from the surrounding conventional stormwater systems (which include several direct discharge outlets to the lake) and nonpoint source runoff. Beach closures due to high bacteria counts had become a repeated occurrence. The Ipswich River basin in which Silver Lake sits is a heavily stressed watershed. American Rivers named the Ipswich River the third most endangered river in the country in 2003, reflecting the severe and chronic reductions in flow the river has experienced, mainly due to evapotranspiration rates from development and increased groundwater withdrawals. Long sections of the river had even occasionally dried up altogether.The Massachusetts Department of Conservation and Recreation (DCR) received a demonstration grant from the U.S. EPA's Targeted Watershed Program to demonstrate an integrated approach to addressing the multiple problems facing the Ipswich River. Their goal was to employ innovative techniques to help increase groundwater recharge and base flow. The Town of Wilmington, working with the DCR, wanted to look into ways to minimize polluted stormwater runoff entering Silver Lake, improve the lake's water quality, and minimize the number of beach closings each summer due to bacteria violations. Low impact development (LID) strategies, such as landscaping and design techniques that capture stormwater and recharge it to the groundwater before it enters a surface water body, if employed widely, could potentially assist in meeting these multiple goals.

Town Line Brook Stormwater Management Planning and Design

2026-04-06T11:39:56-06:00October 29th, 2009|

The highly urbanized Town Line Brook watershed contains parts of four coastal towns that were long ago developed on a former salt marsh and that continually flood during storm events. Causes of flooding in the area were believed to include tidal and stream flow restrictions and lack of adequate drainage due to the highly urbanized conditions. Impacts of flooding include water quality problems, sedimentation, damage to homes and businesses, sewer backup conditions, and increased runoff.The Massachusetts Environmental Trust (MET) provided grant funding to study the exact causes of the flooding in the Town Line Brook area, and to propose a variety of management and engineering options to correct the problem. Before this project, many study dollars had been spent to produce hard engineering solutions involving very expensive infrastructure improvements. MET was hoping to find an effective solution that would not drain the public coffers.

Environmental Management System for GSA Denver Federal Center

2026-04-06T11:38:11-06:00October 29th, 2009|Tags: |

The U.S. General Services Administration (GSA) Rocky Mountain Region manages the Denver Federal Center (DFC), a 640-acre campus hosting 28 federal agencies and nearly 7,000 employees. It is the largest concentration of Federal agencies outside of Washington D.C. GSA leadership has envisioned a sustainable campus, where environmental performance improvements yield measurable business results. To establish a framework for reaching its vision and meeting its sustainability goals, GSA decided to implement an environmental management system (EMS) at DFC. As a vehicle for culture change and improved business practices, the GSA EMS is intended to lead to environmental "best practice" outcomes and result in measurable cost savings.

Pollution Prevention to Reduce Maintenance Costs and Emissions at Robins AFB

2026-06-16T14:30:22-06:00October 29th, 2009|Tags: |

Robins Air Force Base [RAFB] was born during WWII as an Army Air Depot, and continues to supply parts for maintenance and repair of missile systems, aircraft, and avionics vital to US defense. Today it covers over 8400 acres with over 14 million square feet of facilities (including 3.8 million square feet of maintenance shops) and employs a workforce of nearly 20,000. In 1988, the RAFB Directorate of Environmental Management was established, with Pollution Prevention (P2) as one of the "Four Pillars" of its program. RAFB P2 efforts result in reduction of personal protective equipment, legal and medical liability, hazardous waste disposal, process time labor, tracking, storing & permitting reporting, and cost & production time.

One of RAFB's EM goals is to develop technology advances directed towards transforming depot maintenance activities to meet future challenges - such as minimization of pollution generating materials, reducing hazardous material dependency, enhancing total Ownership Cost risk levels, and others.



Nuclear Metals, Inc. Superfund Site Remedial Investigation and Feasibility Study

2026-06-16T14:30:08-06:00October 29th, 2009|Tags: , , |

Nuclear Metals, Inc. (NMI) used depleted uranium (DU) in the manufacture of penetrators for the US Army. From 1958 to 1985, process waste (DU, nitric acid, and lime) was disposed in an unlined holding basin at this Boston-area manufacturing facility now surrounded by residential neighborhoods. As a result, DU was released to soils and groundwater near the basin.

Innovative Landfill Foundation Improvement Technique at the Cherry Island Landfill Allows a Major Vertical Expansion

2026-06-16T14:30:01-06:00October 29th, 2009|Tags: , , |

The Cherry Island Landfill (CIL) is located in Wilmington, New Castle County, Delaware at the confluence of the Delaware and Christina Rivers. The Delaware Solid Waste Authority owns and operates the facility to serve the residential and commercial customers in the County. To meet the growing demands for MSW disposal space, DSWA established the goal of extending the life of the site by creating additional airspace on top of the existing landfill footprint - if constructability issues could be resolved. The existing landfill was initially constructed in 1985 over an area that was partly reclaimed from the Delaware River, and was used for many years as a dredged material disposal site for the U.S. Army Corps of Engineers. As a result, the subsurface characteristics at the CIL site consist of very soft and extremely compressible materials. Previous stability analysis indicated that the capacity of the landfill for vertical expansion was limited and, based on the incoming waste stream, the site would reach its capacity in 2006. DSWA's goal was to develop a cost-effective design that could overcome the stability issues associated with the subsurface materials and allow a major facility expansion.

Shawsheen River Interactive Recreational Map

2026-06-16T14:30:06-06:00October 29th, 2009|

The Shawsheen River winds for about 25 miles through all or parts of 12 communities in northeastern Massachusetts before emptying into the Merrimack River in Lawrence. With the decline of its industrial base, and especially since passage of the Clean Water Act in the 1970s, local citizens have begun looking at the Shawsheen River as a resource for outdoor recreational opportunities such as canoeing, hiking, biking, fishing and sightseeing. However, it was difficult to find out where such opportunities existed and how to take advantage of them. The Massachusetts Division of Fish, Wildlife and Environmental Law Enforcement (Fish & Wildlife) established a goal of providing an easily-accessible and complete graphic representation of the various recreational opportunities along the Shawsheen River from its source to its mouth. Originally envisioned to be simply a hard copy map, an interactive web-based version was also needed to encourage maximum distribution and usage. Both versions would need to be easy to use.

Slurry Wall and Cover System for Redevelopment of the McColl Superfund Site

2026-06-16T14:30:11-06:00October 28th, 2009|Tags: , , , , |

The McColl Superfund site is a 20-acre former industrial waste disposal facility. From 1942 to 1946, petroleum sludges and other wastes from the production of high octane aviation fuel were placed in 12 unlined pits. In the 1950s, in an effort to control odors and gaseous emissions from the site, several of the pits were covered with diesel oil-based drilling mud. The site was placed on the National Priorities, or Superfund, List in 1982. In 1984, under a CERCLA Unilateral Administrative Order (UAO), the U.S. EPA directed the Potentially Responsible Parties (PRPs) to implement a remedy consisting of excavation and off-site disposal of hazardous wastes that was estimated to cost in excess of $200 million. New residential development and a golf course surrounding the site complicated the remediation, and tarry seeps and malodorous emissions were emanating from the site.

Treatment Wetlands Assessment and Regulatory Support for City of Columbia Regional Wastewater Treatment Plant Expansion

2026-04-06T13:23:20-06:00October 27th, 2009|

The City of Columbia, Missouri sought to upgrade and expand the City's regional wastewater treatment plant capacity from 20.6 million gallons per day (MGD) to 25.2 MGD. The treatment plant consists of an activated sludge mechanical plant followed by a 4-unit, 23-cell constructed treatment wetlands for additional removal of biochemical oxygen demand (BOD) and total suspended solids (TSS). The treatment wetlands system has been in operation since 1994. Geosyntec, in coordination with Black and Veatch Engineers, conducted an assessment of the treatment wetlands to confirm if an upgrade to the wetlands system needed to be included in the plant expansion project. The City also wanted to verify the extent to which natural attenuation of bacteria and ammonia was occurring through the wetlands system. These data would be used to predict bacteria density and ammonia concentrations in the expanded plant effluent for comparison to Missouri water quality criteria.

Go to Top