Geosyntec Consultants Logo

United States

Climate-Related Risk & Opportunity Assessment for a Retail Store Chain

2026-04-02T12:51:51-06:00December 13th, 2021|

A large retail store chain was planning to conduct a Climate-related Risk and Opportunity Assessment associated with their current operations. Once completed, this assessment will become integral to evaluating and mitigating potential risk on short, medium, and long-term business operations and continuity in the face of a changing climate.

Comprehensive Area Plan and Cumulative Impacts Assessment

2026-04-02T12:52:32-06:00December 13th, 2021|

An oil and natural gas company is committed to sustainable operations and leading its home state’s transition to a low-carbon future by demonstrably reducing its emissions, minimizing its environmental impacts, and partnering with local communities. The company has multiple operations in several counties including a specific municipality and needed to prepare a cumulative impacts report as part of a comprehensive area plan to its home state conservation commission.

Southeast Los Angeles Cultural Center

2026-04-02T15:57:29-06:00January 21st, 2021|

The San Gabriel & Lower Los Angeles Rivers and Mountains Conservancy (RMC) in partnership with the Los Angeles County Flood Control District, is developing a project for a Community Cultural Center in Southeast Los Angeles (SELA) near the City of South Gate, California. The SELA Cultural Center is envisioned as a multi-arts facility that weaves together world-class design and high-caliber programming from across Los Angeles County with the vibrant culture of the surrounding community.

Vapor Intrusion/Groundwater Investigation/Regulatory Support

2026-04-02T16:00:04-06:00January 13th, 2021|

Release of chlorinated solvents and hexavalent chromium (site COCs) in the 1980s led to a facility listing under the Ohio Environmental Protection Agency (OEPA) Resource Conservation and Recovery Act (RCRA) Corrective Action Program. In the late 1990s, pump and treat (P&T) systems were constructed by a prior contractor as an interim measure to provide hydraulic containment of impacted groundwater. The P&T systems operated at an annual cost of approximately $100,000 with minimal decrease in contaminant mass and required ongoing maintenance. Geosyntec aimed to delineate the groundwater plumes, investigate and address vapor intrusion concerns, and develop a pathway to site closure.

In-Situ Remediation of Chlorinated Solvents at a Former Manufacturing Facility

2026-04-02T15:57:27-06:00January 6th, 2021|

This former computer hardware manufacturing and assembly facility is located on a twenty-six acre site. Impacted with multiple chlorinated volatile organic compounds (VOCs), the site is under regulatory oversight of the Regional Water Quality Control Board (RWQCB) San Diego Region.

Pre-Remedial Design Investigation and Baseline Sampling for the Portland Harbor Superfund Site

2026-04-02T12:00:26-06:00March 9th, 2020|

Ten miles of the Lower Willamette River in highly urbanized downtown Portland have been impacted with PCBs, metals, and PAHs by industrial, marine, commercial, defense, and municipal activities by 150 parties for more than 100 years. The Record of Decision issued by EPA in 2017 described a combined remedy expected to remove three million cubic yards of sediment, cap 176 acres, take 12 years to implement, and cost $1.2 billion. Geosyntec was retained as the common consultant by the PRP group to co-lead and help them navigate the pre-remedial design and baseline sampling program. In addition, Geosyntec will develop and scope work plans, design a statistically robust random sediment sampling plan, collect quality data, and produce pre-remedial design (RD) reports for agency approval.

Lockout/Tagout Procedures Inspections at Manufacturing Facility

2026-05-26T09:24:31-06:00March 4th, 2020|

The Occupational Safety and Health Administration (OSHA) cited the manufacturing facility for failing to conduct required lockout/tagout (LOTO) procedure annual inspections. LOTO procedures facilitate the proper shut off of equipment for maintenance or repair work.

Highway Stormwater Management and Applied Research Reports and Guidance Documents

2026-04-02T16:00:01-06:00July 8th, 2019|

To improve the decision-making process and support effective water and natural resource program implementation, transportation agencies need synthesized research and guidance on a variety of topics related to stormwater characterization, treatment and control, and regulatory compliance.

Go to Top