Air Permitting Compliance Support for Industrial Laundry Facilities

2026-04-02T16:00:52-06:00March 2nd, 2023|

Faced with a United States Environmental Protection Agency Consent Agreement and Final Order, a confidential industrial laundry client engaged Geosyntec to evaluate air emissions at 35 of its facilities in 15 states and bring them into compliance with federal and state requirements governing air emissions and permitting. The client needed help managing the operation as well as engaging in regulatory agency negotiations to obtain the necessary permits.

Air Consulting Services for CyrusOne, LLC’s Data Centers

2026-04-02T16:00:50-06:00March 2nd, 2023|

CyrusOne, LLC (CyrusOne), the owner of numerous data center sites, needed assistance to determine if air permits were required for both new and existing data centers across the United States. The data centers are equipped with diesel-fired emergency generators to provide backup power to the data center in case of power failure. These emergency generators include belly tanks to store diesel fuel. New data center sites were ready to begin construction and obtaining an air permit (if required) was determined to be a critical path item to meet the project schedule. Sites were evaluated for diesel-fired emergency generator air permit requirements in Arizona, California, Georgia, Illinois, Kentucky, New Jersey, Ohio, Texas, and Virginia.

Air Quality Regulatory Evaluation for a Malt Production Facility

2026-04-02T16:00:49-06:00March 2nd, 2023|

Malteurope North America (Malteurope) needed to evaluate the impact of impending sulfur dioxide National Ambient Air Quality Standards (NAAQS) on their malt production facility in Milwaukee, Wisconsin. The facility operates under a minor-source air permit issued by the Wisconsin Department of Natural Resources (WDNR).

Environmental Compliance Services for Wood Pellets Manufacturer

2026-04-02T16:00:49-06:00March 2nd, 2023|

The purchase of a Cottondale, Florida wood pellet manufacturing plant resulted in the need for new compliance documentation associated with the ownership transfer. The facility is also subject to ongoing compliance obligations under the Clean Air Act and Clean Water Act. .

Confidential Client – Missiles and Fire Control Environmental and Air Quality Compliance

2026-04-06T13:48:46-06:00March 2nd, 2023|

The client has an aerospace research and development, production, and rework facility in Orlando, Florida. We were engaged us to oversee and coordinate the air quality compliance program for this facility.

Low-Head Dam Removal

2026-04-02T12:10:17-06:00April 22nd, 2022|

A low-head dam, originally constructed in the 1800’s, was scheduled for removal in order to increase free movement of aquatic organisms. Pre-existing data included available hydrology and hydraulic models and data from the owner, Federal Emergency Management Agency (FEMA), United States Army Corps of Engineers (USACE), National Oceanic and Atmospheric Administration (NOAA), United States Geological Survey (USGS), and the area’s county, as well as proposed conditions outlined in the owner removal drawings.

Product-Focused Toxicological and Exposure Assessments

2026-05-26T12:32:52-06:00March 16th, 2022|

Geosyntec has been retained by a leading consumer and industrial product registration specialist to serve as their product and chemical toxicology and safety experts related to multiple regulatory and supply chain program requirements. The client specifically requires human health and ecological risk evaluation along with related receptor exposure evaluations to determine margins of safety (MOS) for product consumers through comparison to health-based points of departure (PODs) and regulatory standards.

Environment Social and Governance Program Support for an Energy Company

2026-04-02T16:00:02-06:00December 17th, 2021|

An innovative energy company that creates lower carbon fuel is committed to making environmental gains and sustainable returns for their shareholders, customers, and communities through a cleaner approach for everyday fuels. Working to update their robust sustainability and Environmental, Social, and Governance (ESG) program, the company was looking to evaluate and enhance their ESG initiatives and goals.

Energy Utility Company’s ESG Reporting and Carbon Strategy Project

2026-04-02T12:48:08-06:00December 13th, 2021|

An energy utility company required support with environmental, social, and governance (ESG) reporting and performance metrics, carbon strategies, and legislative actions. The overall project objective was three-fold, and included: i) increasing transparency of sustainability and ESG disclosures and efforts; ii) alignment with state legislation; and iii) developing tools to allow the energy utility company to independently track and monitor efforts as the company progresses toward sustainability and ESG goals.

Comprehensive ESG and Sustainability Program Support for an Energy Company

2026-04-02T12:50:59-06:00December 13th, 2021|

Geosyntec was engaged by a midstream energy company committed to transparency and disclosure of its environmental, social and governance (ESG) and sustainability performance to provide strategic advice in developing and implementing ESG and sustainability goals that drive business performance. The company is a premier energy company engaged in the gathering, processing, treating, compression, storage, transportation, and marketing of natural gas, natural gas liquids, crude oil, and the gathering and disposal of produced water.