Geosyntec installed solar powered water quality monitoring units at the Center Hill Dam to wirelessly transmit construction and other data to a real-time internet-based reporting system.
Geosyntec installed solar powered water quality monitoring units at the Center Hill Dam to wirelessly transmit construction and other data to a real-time internet-based reporting system.
The US Army Corp of Engineers (USACE) managed a $106 million rehabilitation of the Center Hill Dam in Tennessee. The massive rehabilitation effort included the installation of an approximately 200,000-square-foot barrier wall, the main protective feature in the seepage remediation project that extends more than 300 feet into the earthen embankment and underlying foundation bedrock. Center Hill Dam is the highest priority project of USACE's system for the development of the water resources of the Cumberland River Basin. As a major unit in the system, Center Hill Dam and Lake function to control the floodwaters of the Caney Fork River and contribute to the reduction of flood levels at municipal, industrial, and agricultural areas along the Cumberland and lower Ohio and Mississippi Rivers. In addition to the far-reaching effects of flood control, the dam contributes to the electrical power supply of the area through the generation of hydroelectric power. Monitoring of instrumentation during construction is a key method by which the USACE ensures not only the safety of the dam itself but the safety of the workers at the dam as well.