Geosyntec Consultants Logo

South Carolina

CAP Approach to Site and Stream Remediation and Reduction of Hydrocarbons in Fractured Bedrock Aquifer at a Former Manufactured Gas Plant

2026-07-20T07:40:35-06:00July 20th, 2026|

At the Colonial Pipeline Gaffney booster station site, the overburden and bedrock aquifers beneath the site have been impacted with dissolved petroleum hydrocarbons associated with historical operations and spills at the facility. A methyl tertiary butyl ether (MTBE) and benzene plume had migrated to both the north and the south part of the site because of the groundwater divide near the spill area.

Drum Island Mitigation Site Design Peer Review

2026-04-06T13:45:59-06:00April 10th, 2023|

To construct the new Hugh Leatherman Terminal in Charleston, South Carolina, the South Carolina Ports Authority designed 22 acres of wetlands mitigation. The Authority hired ATM, a Geosyntec Company, to conduct a comprehensive peer review of this site design with a focus on value engineering to control costs and suggest project enhancements to support successful mitigation.

Crab Bank Sedimentation Study and Habitat Restoration

2026-04-02T16:44:49-06:00April 10th, 2023|

As part of the Charleston Harbor Deeping Project, the United States Army Corps of Engineers (USACE) elected to use 660,000 cubic yards of dredge spoil to help rehabilitate the Crab Bank Seabird Sanctuary, once a flourishing nesting site. The proposed location of Crab Bank was just offshore of Shem Creek, a vital asset of Mount Pleasant, South Carolina. Because the Town of Mount Pleasant had concerns about the location chosen for the Crab Bank project, they hired ATM, a Geosyntec Company, to evaluate the potential impacts to the creek.

Green Pond Landing and Event Center, Anderson County, South Carolina

2026-04-02T16:44:47-06:00September 17th, 2021|

Lake Hartwell occupies 56,000 acres along the South Carolina/Georgia border, is an important environmental resource, and provides a plethora of recreational opportunities, including outstanding fishing. In fact, after this project, the lake hosted the 2018 Bassmaster Classic, and numerous other high-level bass tournaments take place there each year. Since 2011, ATM, a Geosyntec Company, has provided project planning, permitting, engineering, and consulting services to Anderson County to support the development of the Green Pond Landing and Event Center Project on Lake Hartwell. As part of a multidisciplinary team, we provided comprehensive consulting to support development of a six-lane mega-ramp and bass tournament facility.

Municipal Marina Redevelopment, Isle of Palms, South Carolina

2026-04-02T16:44:46-06:00September 17th, 2021|

After purchasing its municipal marina two decades before work began, the City of Isle of Palms recognized that the facility's infrastructure was aging while its popularity had increased to the point where parking and traffic became extremely problematic. ATM, a Geosyntec Company, led a multidisciplinary team of consultants supporting the City with redevelopment of the marina.

Design and Permitting for Coal Combustion Residuals Requirements and Effluent Limitation Guidelines

2026-04-02T15:28:29-06:00July 24th, 2015|Tags: , |

Geosyntec provided comprehensive services to Santee Cooper at the Winyah Generating Station to assist the facility with compliance with the pending implementation of the federal Coal Combustion Residuals (CCR) Rule and Effluent Limitation Guidelines (ELGs).

Private and Municipal Landfill Gas to Energy Opportunity Assessments in South Carolina for Santee Cooper

2026-04-02T15:50:53-06:00October 28th, 2009|Tags: , |

Santee Cooper, a leading supplier of electricity in South Carolina, established a "green power" generation portfolio goal of 54 MW of electricity from operating landfill gas to energy (LFGE) projects. The process involves identifying, quantifying, qualifying, and securing a contract for the gas source, and then constructing the generation equipment and connection to the power grid.

Go to Top