Design of Foundation and Structural Integrity Support System for Soil Removal Beneath an Operating Manufacturing Facility
The owners of an active aircraft hydraulics manufacturing and testing facility in southwest Michigan were charged by state regulators with the removal of a large quantity of soil and other materials from beneath an active processing area known as the EPD Room. The owners turned to Geosyntec to engineer a system that would allow soil removal without disturbing foundation elements while maintaining the structural integrity of the active facility.










