Fuels Terminal Demolition at a Former Oil Refinery

2026-04-02T15:50:53-06:00October 24th, 2009|

The site is a 400+ acres located in Los Angeles that includes a former refinery process area, a former chemical manufacturing/current chemical storage facility, and a large active petroleum tank farm area. The site is bounded by residential, commercial, and industrial land uses. The former oil refinery process area encompasses approximately 80 acres of the site. The site owner's goal for this project was to prepare the site for future uses by demolishing the underground foundations, process piping (both steel and asbestos-cement), electrical, sewers, and drains, and backfilling the site and grading in the former process area.

Tar Excavation and Removal from a Former Oil Refinery

2026-04-02T15:50:52-06:00October 24th, 2009|

The site is 400+ acres in Los Angeles that includes a former refinery process area, a former chemical manufacturing/current chemical storage facility, and a large active petroleum tank farm area. The site is bounded by residential, commercial, and industrial land uses. Within the facility there were several locations where tar had been previously deposited into pits and large open surface areas. The site owner's goal for this project was to prepare the site for future uses by removing the geotechnically unsound tar, often found mixed with asbestos-containing material.

Geotechnical Investigation and Landslide Stabilization at Vandale Junkyard Superfund Site

2026-06-16T14:30:23-06:00October 23rd, 2009|Tags: |

The Vandale Junkyard NPL site was operated as a permitted junkyard for over 40 years, and was included on the NPL in 1986. After extensive site investigation activities conducted by others, U.S. EPA Region 5 issued the Record of Decision (ROD) in 1994 calling for a non-time critical remedy involving capping. During the junkyard's active life, waste in one area of the site was ignited at the top of a 150-ft high slope, which resulted in a solid waste residue (SWR) consisting of glass, metal debris, and ash mixed with soil. The SWR was pushed down the slope over the natural colluvium present over bedrock. The planned remedy developed by others for the site included placement of stockpiled waste from other areas of the site over the SWR and a final cover system installed over the placed waste materials. At the onset of remedy implementation, it was discovered that the hillside was geologically unstable and the surficial SWR and colluvial soil were actively creeping downslope. The EPA required the site PRP group to quickly investigate the cause of the geologic instability and to develop a revised site design to stabilize the slope and achieve the environmental remedial action objectives. The PRPs retained Geosyntec to undertake this scope of work.

Feasibility Study for Sediment Removal and Design of Sediment Containment Area at Onondaga Lake

2026-04-02T15:50:53-06:00October 23rd, 2009|Tags: |

Prior waste disposal practices and stormwater runoff into Onondaga Lake, a 4.6 square-mile lake just northwest of Syracuse in central New York State, impacted water quality and sediments throughout the water body. As a result, stakeholders including U.S. EPA, New York State Department of Environmental Conservation, and industries with past operations in the vicinity of the lake began the process of negotiating a Consent Decree that would result in the restoration of lake water quality and ensuring that impacted sediments posed no undue threat to future human health or the ecology of the lake.

Interactive Geographical Information Systems and Application Development for Data Management, Herbert Hoover Dike Rehabilitation, Lake Okeechobee, Florida

2026-06-16T14:30:18-06:00October 23rd, 2009|Tags: , |

The Herbert Hoover Dike (HHD) rehabilitation project is designed to stabilize and secure the aging dike from potentially damaging severe weather events, and protect the numerous residents and businesses on the southeastern rim of Lake Okeechobee. In 2007, the U.S. Army Corps of Engineers (USACE) placed the HHD on the Top 6 list of dams in the nation needing repair. The USACE Jacksonville District prioritized rehabilitation of dike segments that were identified as most vulnerable, focusing initial efforts to achieve the most significant impacts. In May 2008 the Jacksonville District selected Bauer Foundation Corp. (BFC) to construct a 3-mile long segment of the planned cutoff wall that runs vertically from the dike crest to a depth of 70 feet in certain locations.The challenge of compiling and viewing the large quantity and diversity of data collected for this project required an innovative solution. In December 2008 BFC selected Geosyntec to develop an application by which BFC and its client, USACE, could view the data as it is collected and interactively search for values and generate time-critical reports.

Combined Co-Solvent Soil Flushing and In Situ Bioremediation at a Former Industrial Waste Disposal Site

2026-04-06T13:22:12-06:00October 23rd, 2009|Tags: , |

This 30-acre site was the former location of a disposal area burn pit where a wide variety of liquid and solid wastes generated from a nearby manufacturing facility were disposed and periodically burned off. A site investigation began in 1984 under an order issued by the Tennessee Department of Environment and Conservation (TDEC). Primary contaminants of concern at the site include halogenated solvents such as trichloroethylene (TCE), 1,1,1-TCA, and Freon 113. The TDEC issued a Record of Decision (ROD) in 1996 that specified multiple remedies, including soil vapor extraction (SVE), focused excavation, and soil flushing for soils in the burn pit area. The monitoring data collected after a SVE system had been in operation for five years suggested asymptotic performance. The client retained Geosyntec to design and implement a soil flushing pilot test for a comprehensive approach integrating the soil flushing remedy with the site's groundwater remediation program.

Airport Improvements Subsurface Investigation and Geotechnical Recommendations

2026-04-02T15:49:48-06:00October 22nd, 2009|Tags: |

McClellan-Palomar Airport is a commercial airport located in Carlsbad, San Diego County, California, serving the general aviation community, corporate aircraft, and commercial services operated by the County of San Diego Department of Public Works. The county proposed numerous improvements to the airport including construction of a new terminal building to replace an existing building, upgrading Taxiway C, adding additional aircraft parking, re-routing the existing drive aisles for the new terminal building, and construction of an elevator and pedestrian bridge from the lower parking area to the upper terminal building.Because the airport was constructed over three unlined, inactive municipal solid waste landfills, ongoing settlement and the potential presence of methane present continuous challenges for expanding the airport's operations. As a result, the geotechnical analysis required for the proposed improvements required the careful characterization of the general nature and extent of existing fill and landfill waste deposits along the lower parking lot perimeter and their effects on geotechnical engineering design recommendations.

Non-Urban Levee Evaluation Program

2026-06-16T14:30:20-06:00October 22nd, 2009|

The California Department of Water Resources (DWR) is leading a multifaceted initiative called FloodSAFE California to improve integrated flood management throughout the state, with an emphasis on improved flood risk management related to the state-federal flood protection system in the Central Valley. DWR is evaluating approximately 1,230 miles of non-urban levees.The Non-Urban Levee Evaluation (NULE) Program team is assessing the condition of non-urban State-federal project levees and associated non-project levees, to determine conformance with geotechnical criteria and, where needed, identify remedial measures, including cost estimates, necessary to meet those criteria. The information being developed through the NULE Program will be used within the Central Valley Flood Management Planning Program to inform development of two required documents: the Flood Control System Status Report and the Central Valley Flood Protection Plan.

Geotechnical Exploration and Engineering Analyses Supporting Redevelopment Design and Construction Activities

2026-04-02T15:49:47-06:00October 22nd, 2009|Tags: |

The Britannia Modular Laboratories 4 (BML4) project, located in South San Francisco, California, consists of three existing buildings that have been renovated for conversion to laboratory and office use. This project involves demolition or upgrade of the structures, including the addition of a new pile-supported second floor mezzanine inside one building; new canopy entrances for each building; a new service yard for heavy equipment related to laboratory infrastructure; and new site work (parking lot, walkways, etc.) - all with challenging ground conditions. Geosyntec was selected by the conversion team to develop geotechnical engineering recommendations for foundations and other site infrastructure.

Field Exploration and Laboratory Testing Program to Support Gabion Wall Stability Assessment

2026-04-06T13:19:19-06:00October 22nd, 2009|

A Fortune 100 company requested that Geosyntec provide a technical assessment and evaluation of a 2,200-foot long gabion-faced combination gravity and mechanically stabilized earth wall at one of its major distribution centers in the eastern United States. Other retaining structures on the project site experienced significant movements or collapse. Previous consultants expressed concern regarding the long-term stability and distress for this wall such that the owner would be required to initiate major rehabilitation activities to stabilize it. The owner was actively considering complete wall rehabilitation at an estimated cost of $2.5 million.