Development of Design Standards for Enhanced Removal of Phosphorus to Protect Receiving Waters in New York State

2026-04-02T15:49:57-06:00October 27th, 2009|Tags: , |

The "East of Hudson" reservoirs are a series of natural water bodies, mainly in Putnam and Westchester Counties east of the Hudson River north of New York City, that provide much of the city's drinking water. One of the ongoing threats to these reservoirs is eutrophication, or choking of the water body from the decay of excessive plant material. This excess plant material is mainly due to phosphorus inputs in the form of septic and lawn fertilizer runoff from surrounding residential development in the city's growing northern suburbs.

Post-Fire Emergency Flood/Erosion Protection for the County of San Diego

2026-06-16T14:30:02-06:00October 27th, 2009|Tags: |

Nearly four years after the historic 2003 wildfires devastated San Diego County, strong, shifting Santa Ana wind conditions, combined with high temperatures, low humidity, and multiple years of drought combined to create the perfect conditions for fast spreading wildfires in 2007. The 2007 fire season saw approximately 500,000 acres burned within Southern California, with over 340,000 acres within San Diego County alone, destroying over 2,300 structures and several people losing their lives. With winter rains fast approaching, the County of San Diego faced the potential for devastating mudslides and debris flows that could inundate thousands of homes, close evacuation routes, and cause significant environmental damage. Using Geosyntec's 2003 Post-Fire hazard response as a model, personnel from the County and Geosyntec initiated an Emergency Flood / Erosion Protection Program that first assisted homeowners in protecting their property, then stabilized watersheds to reduce mudslides and debris flows.

Port of Los Angeles Vacuum Consolidation Technology Demonstration

2026-06-16T14:30:12-06:00October 27th, 2009|Tags: |

The Port of Los Angeles sought a field test of vacuum-assisted preconsolidation of hydraulic fill to assess the feasibility of this technology as an alternative or supplement to conventional surcharge techniques for ground improvement of future hydraulic fill sites at the Port.

El Monte Operable Unit Treatment System and Conveyance Network Design

2026-06-16T14:30:19-06:00October 27th, 2009|Tags: , , |

The San Gabriel Basin has been the subject of environmental investigation since 1979 when groundwater contaminated with volatile organic compounds (VOCs) was first detected. In May 1984, four areas of groundwater contamination within the San Gabriel Valley were listed on the U.S. EPA National Priorities List (NPL).

Herbert Hoover Dike Rehabilitation Reach 1 Seepage Cutoff Wall at Lake Okeechobee, Florida

2026-04-02T14:30:47-06:00October 27th, 2009|Tags: , |

The Herbert Hoover Dike (HHD) rehabilitation project is designed to stabilize and secure the aging dike from potentially damaging severe weather events, and protect the numerous residents and businesses on the southeastern rim of Lake Okeechobee. In 2007, the U.S. Army Corps of Engineers (USACE) placed the HHD on the Top 10 list (at No. 6) of dams in the nation needing repair. The USACE Jacksonville District prioritized rehabilitation of segments that were identified as most vulnerable, focusing initial efforts on achieving the most significant impacts.

The cutoff wall, a critical design feature in the dike rehabilitation, will minimize existing internal erosion, known as "piping," and prevent further damage to the internal structure of the dike. A 22-mile stretch from Port Mayaca south to Belle Glade that is considered the most vulnerable section of the 143-mile dike is the first wall section to be built. The work began in 2008 and is scheduled for completion in 2012. In May 2008 the USACE Jacksonville District selected Bauer Foundation Corp. (BFC) for the first of four (4) major task orders to construct a total of 10 -miles of the planned cutoff wall that runs vertically from the dike crest to a depth of nearly 80 feet in certain locations. BFC selected Geosyntec as part of its team to provide construction quality control/quality assurance services, geotechnical engineering support, environmental protection monitoring, subsurface barrier construction consultation, and provide additional technical resources related to dam and levee rehabilitation.

RCRA Corrective Action Program Human Health and Ecological Risk Assessment at NASA Kennedy Space Center

2026-04-02T15:49:55-06:00October 27th, 2009|Tags: , |

Abutting the Atlantic Ocean and Central Florida's Banana and Indian Rivers, the John F. Kennedy Space Center is home to a diverse mix of federally and state-listed species and nearly 140,000 acres of diverse wetland and upland habitats, including mangroves, mudflats, salt, cattail, and freshwater marshes, pine flatwoods, oak hammocks, and cabbage palm savannas.

Richland Creek Landfill Leachate Pre-treatment System Design and Construction Phase Support

2026-04-02T15:50:26-06:00October 27th, 2009|Tags: |

The Richland Creek Landfill is a large municipal solid waste landfill located in Buford, Georgia. Leachate collected from the landfill is discharged to the local water reclamation facility under a discharge permit. The permit established effluent limitations for certain parameters, most notably ammonia nitrogen and biochemical oxygen demand (BOD). The permit imposes surcharge limits for these constituents when there concentrations are over the permitted limits.

Water Supply System Geohazard Assessment and Mitigation Engineering for Sonoma County

2026-04-02T15:50:26-06:00October 27th, 2009|

The Sonoma County (California) Water agency is a wholesale purveyor of water to nine public entities in Sonoma and Marin counties serving a total population of 600,000 people. The agency uses its transmission system to divert approximately 62,000 acre-feet per year from the Russian River, its main water source, and has a goal of diverting 75,000 acre-feet per year by 2014. The agency initiated a comprehensive reliability improvement program because they recognized that the water system is located in an area of numerous potential natural hazards such as earthquakes, floods, wildfires, and landslides, and that portions of the system are aging and were not designed to withstand the imposed demands, especially those imposed by earthquakes. The agency selected MMI Engineering, a Geosyntec operating company, to complete a multi-year, multi-hazard reliability assessment and mitigation program for the water supply and transmission system.

Stormwater Master Planning, BMP Design, and Infrastructure Retrofitting at Robins Air Force Base

2026-04-02T15:50:27-06:00October 27th, 2009|Tags: , |

Robins Air Force Base (Base) in Warner Robins, Georgia sought storm water infrastructure master planning and retrofitting for its existing system. The Base was initially constructed in 1941 on dairy farm pastureland and extensive growth has now transformed it into the current largest major defense/industrial installation in Georgia. The majority of stormwater runoff from the 11-square mile Base is conveyed to a wetland system along the eastern perimeter of the Base which constitutes the floodplain of Ocmulgee River.

Lake Lucerne Sediment Removal and Wetlands Enhancement, Stone Mountain, Georgia

2026-04-02T15:50:52-06:00October 27th, 2009|Tags: |

During the summer and fall of 1998, stormwater runoff from a recently constructed retail site in Stone Mountain, Georgia resulted in the release of soil material from the site. The material ended up 0.1 miles downstream in a small cove area in Lake Lucerne. Lake Lucerne is a private lake held and managed by the Lake Lucerne Homeowners Association.