Geosyntec Consultants Logo

North America

Implementation of an In Situ Thermal Desorption Remedy for Regulatory Site Closure

2026-04-02T15:50:27-06:00October 27th, 2009|Tags: |

A portion of the privately owned "Route 44" property was excavated in the 1930s for fill for an off-site construction project. The resulting borrow pit was gradually filled with drums containing a variety of wastes. In the 1990s, the U.S. EPA conducted a series of site characterization studies, and in 2001, removed over 800 drums from the site. These removal activities were suspended after labels bearing the name of a nearby manufacturer were found on some of the drums. EPA then sent a Remedial Action letter to the corporate successor of that firm, who subsequently retained Geosyntec to provide oversight of the remaining drum removal activities, as well as to guide the site through the subsequent site assessment and remediation process and to ultimately achieve regulatory closure under the Massachusetts Contingency Plan (MCP).

Bioremediation in Overburden and Bedrock to Address Chlorinated Solvents

2026-04-02T15:50:27-06:00October 27th, 2009|Tags: , |

An accidental release of TCE decades ago contaminated overburden and bedrock at this manufacturing plant. Remediation did not occur until contamination was discovered during an investigation performed as part of a property transaction. Upon this discovery, a pump and treat system was installed by another firm in the suspected source area. This system operated for about a decade, and removed approximately one pint of TCE annually with reported O&M costs of $80,000 per year. Despite groundwater pumping, TCE migrated into the bedrock, moved downgradient and then off-site. TCE and its daughter products eventually began discharging into a stream located on a neighboring property. These seeps have impacted water quality in the stream and threatened to impact water quality in the lake into which the stream discharges. Geosyntec was asked by the client to assist the incumbent consultant in implementing bioremediation in the source area and install a barrier (biobarrier) in bedrock at the property boundary to prevent off-site migration of VOCs.

Construction of an Innovative Permeable Reactive Barrier to Passively Treat TCE within a Storm Sewer System

2026-04-02T15:50:26-06:00October 27th, 2009|Tags: |

The Michoud Assembly facility is an active plant operated by Lockheed Martin for NASA. The facility is engaged in the manufacture and assembly of the external tank for the space shuttle. In 1966, about 100 tons of TCE were released from a large tank in the Building 190 Tank Farm Area. Subsurface investigations revealed the presence of chlorinated ethenes, primarily TCE and its degradation products, in soil and groundwater samples. A groundwater extraction and treatment system was installed to address shallow groundwater contamination. However, the storm drainage system within the area has been found to be leaking and therefore acts as a groundwater "sink" in the main area of contamination. This leakage to the storm sewer system resulted in unacceptable concentrations of VOCs in the storm sewer water.

Treatment Wetlands Assessment and Regulatory Support for City of Columbia Regional Wastewater Treatment Plant Expansion

2026-04-06T13:23:20-06:00October 27th, 2009|

The City of Columbia, Missouri sought to upgrade and expand the City's regional wastewater treatment plant capacity from 20.6 million gallons per day (MGD) to 25.2 MGD. The treatment plant consists of an activated sludge mechanical plant followed by a 4-unit, 23-cell constructed treatment wetlands for additional removal of biochemical oxygen demand (BOD) and total suspended solids (TSS). The treatment wetlands system has been in operation since 1994. Geosyntec, in coordination with Black and Veatch Engineers, conducted an assessment of the treatment wetlands to confirm if an upgrade to the wetlands system needed to be included in the plant expansion project. The City also wanted to verify the extent to which natural attenuation of bacteria and ammonia was occurring through the wetlands system. These data would be used to predict bacteria density and ammonia concentrations in the expanded plant effluent for comparison to Missouri water quality criteria.

Technical Consultant Services as Part of an Ecological Water Resources and Assessment Project

2026-04-06T13:02:10-06:00October 27th, 2009|

The Missouri Department of Natural Resources (MDNR) identified science-based policy analysis as a key administrative objective following a Federal review of Missouri's Water Quality Standards Program in 2000. U.S. EPA Region 7 selected the Environmental Resources Coalition (ERC) to administer an Ecological Water Resources and Assessment Project (EWRAP) grant to assist MDNR in developing a science-oriented approach. ERC selected Geosyntec to be the lead technical consultant for ERC and MDNR.

Site-Specific Dissolved Oxygen Criteria and Wasteload Allocation Modeling Study

2026-04-06T09:20:49-06:00October 27th, 2009|

The City of Blue Springs (City) is in need of additional infrastructure to accommodate growing wastewater needs as development progresses around the Kansas City metropolitan area. To accommodate anticipated growth, the City is planning an expansion and upgrade to their current wastewater treatment facility (WWTF), which discharges into Sni-A-Bar Creek. Perennial reaches of Sni-A-Bar Creek are included in Missouri's impaired waters list due to low dissolved oxygen (DO) concentrations. Geosyntec and agency scientists believed that Sni-A-Bar Creek did not attain statewide DO criteria naturally during summer conditions as a result of shallow depths, high residual sediment oxygen demand, low reaeration, and transient stagnant features such as beaver dams and backwater areas. To permit expansion of a WWTF that discharges to impaired reaches, state regulatory policies require intensive water quality study and evaluation of attainable conditions. HDR | Archer Engineers retained Geosyntec on behalf of the City of Blue Springs to evaluate water quality conditions within this basin, develop site-specific dissolved oxygen targets, and perform water quality modeling to assist in wastewater planning and permitting efforts.

Water Quality Monitoring, Data Management and Analysis for a Municipal Sewer District

2026-04-14T13:53:47-06:00October 27th, 2009|

The Metropolitan St. Louis Sewer District (MSD) awarded Geosyntec a multi-year contract to collect surface water samples at six urban stream and eight large river ambient water quality monitoring stations to characterize baseflow and wet weather water quality conditions. As part of MSD's compliance monitoring and combined sewer overflow (CSO) remediation programs, Geosyntec collects monthly samples per station that includes both baseflow and storm flow conditions. In addition to the ongoing water quality monitoring effort, Geosyntec has developed a water quality database to store new and existing water quality data that will allow analyzing these data for trends and to identify any potential regulatory issues.

Effectiveness of Environmentally Sensitive Site Design and Low Impact Development on Stormwater Runoff Patterns

2026-06-16T14:30:20-06:00October 27th, 2009|

In order to understand, and possibly mitigate, observed reductions in water flow throughout the Ipswich River Watershed, the Massachusetts Department of Conservation and Recreation (DCR), using funds from a U.S. EPA Targeted Watershed Grant, retained Geosyntec to evaluate the impacts of stormwater flow using Low Impact Development (LID) stormwater management design techniques. Geosyntec designed the study to contrast the stormwater runoff patterns of well-documented conventional development stormwater management with the real-world application of environmentally sensitive site design and LID principles, thus determining the degree to which stormwater runoff is reduced in a new housing development compared to an existing conventional development. The results of this state-of-the-practice comparison would allow communities and developers to assess the effectiveness of the design types and create benchmarks for LID stormwater management. The immediate goal was to help improve groundwater base flow and develop a scientifically-based, reliable stormwater model to aid in other future LID designs within the Ipswich River Watershed. Careful lot-by-lot delineation of drainage and a complete understanding of the flow paths during rainfall events was critical for the success of this project. Partridgeberry Place, a recent residential development, was chosen as the evaluation site.

Pier G Wharf Loading System Upgrade and Pile Driving CQA – Port of Long Beach

2026-06-16T14:30:11-06:00October 27th, 2009|Tags: |

To accommodate for a new, heavier shiploader, the existing Pier G wharf in Port of Long Beach, California had to be upgraded to increase speed and capacity The design called for a moment resisting space frame to be constructed within the existing wharf footprint, yet independent of the existing structure.

Vapor Intrusion Assessment and Innovative Technologies Help Reduce Long-Term Liabilities

2026-08-14T14:16:22-06:00October 27th, 2009|Tags: |

The Raritan Arsenal was used by the U.S. Army from World War I until the 1960s as an ammunition storage and renovation facility. It has since been redeveloped and reoccupied for multi-unit commercial use. There are chlorinated solvents in groundwater at the Site, which are being monitored and remediated. The New Jersey Department of Environmental Protection (NJDEP) requested an assessment of subsurface vapor intrusion into indoor air and required the U.S. Army Corps of Engineers (Corps), now responsible for Site cleanup actions, to conduct extensive sub-slab and indoor air monitoring. Three years of monitoring data repeatedly showed detectable concentrations of volatile organic compounds (VOCs) in groundwater, soil gas and indoor air samples, interpreted by the NJDEP as a complete exposure pathway despite indications of interior sources for both tetrachloroethene (PCE) and trichloroethene (TCE). Repeat sampling of groundwater, sub-slab soil gas and indoor air by the previous consultant simply confirmed detections of PCE and TCE in all three media. Prior to the NJDEP issuing an Order for expensive mitigation, the Corps retained Geosyntec through Shaw Environmental (Shaw) to review historic data, provide an independent interpretation, and conduct a single phase of data collection to resolve once and for all the relative contributions of vapors from sources inside the building versus any contribution of vapors from the subsurface, and refine the mitigation program to an appropriate level.

Go to Top