Biodegradation of DNAPLs through Bioaugmentation Verified at NASA Kennedy Space Center LC 34 Site

2026-04-02T15:51:22-06:00October 29th, 2009|Tags: |

NASA has always been on the leading edge of technology development and application - not only in space exploration, but also in the areas of environmental compliance and resource stewardship. To that end, NASA is a leading proponent of field testing new and innovative technologies that will benefit their own site restoration program, as well as contributing to the wider application of cost-effective remedies for impacted environments. A common contaminant issue at NASA sites, as at other facilities where industrial solvents have been used, is the presence of trichloroethene (TCE) in groundwater.In the 1960s, Launch Complex 34 (LC-34) at the Kennedy Space Center in Florida was an active launch site for the Apollo program. As a result of TCE releases to groundwater during that period, TCE is now found in the sandy aquifer underlying the site in the form of a dense, non-aqueous phase liquid (DNAPL). NASA, through its Small Business Innovation Research initiative, selected Geosyntec to develop and implement a field testing program of bioaugmentation technologies to target TCE DNAPL in groundwater using LC-34 as the demonstration site with the goal of documenting and reporting the efficacy of this remediation technology to the scientific and engineering community. As part of this program, Geosyntec collaborated with the U.S. EPA Superfund Innovative Technology Evaluation (SITE) program, which collected independent data to validate the bioaugmentation performance.

Long Pond Watershed Low Impact Development Program for Water Quality Improvements

2026-04-02T15:51:22-06:00October 29th, 2009|

The Town of Littleton's Clean Lakes Committee obtained a Clean Water Act Section 319 grant from the Massachusetts Department of Conservation and Recreation (DCR) to implement a series of low impact development (LID) projects and other improvements to the area in and around the Long Pond beach to better treat stormwater, eliminate or minimize beach closings, and generally improve the pond's water quality. The 99-acre pond is listed by the State as "impaired" by nutrients, low dissolved oxygen, and noxious aquatic plants. Excessive nutrient loading comes from the adjacent residential septic tank systems and runoff from the curb-and-gutter stormwater collection system within this rapidly urbanizing community northwest of Boston. Littleton's long-term goal for Long Pond is water quality improvement that will return the beach area to an attractive recreation destination for town residents.

Innovative Remedy for Perchlorate in Soils and Groundwater at Olin Morgan Hill Site

2026-04-02T15:51:23-06:00October 29th, 2009|Tags: |

Olin Corporation (Olin) began signal flare manufacturing operations in 1955 at an 11-acre property located in Morgan Hill, California. Signal flare manufacturing continued at the site until 1996. In 2000, perchlorate was detected in the site soil and groundwater during a due diligence investigation stemming from Olin's efforts to sell the property. The Central Coast Regional Water Quality Control Board (Board) issued a series of Orders that prompted Olin to conduct additional soil and groundwater characterization. In March 2003, the Board instructed Olin to submit an evaluation of potential remedial alternatives for on-site groundwater and soil. Pending the outcome of a data gap analysis and the establishment of a soil remediation goal, the preliminary Alternatives Evaluation (prepared by an incumbent consultant) anticipated that the remedial scope would include extraction and treatment of groundwater at 30 gallons per minute (gpm), and treatment of 10,000 cubic yards of soil. In September 2003, the Board issued an Order requiring Olin to initiate groundwater remediation by the end of the year and soil remediation in the first quarter of 2004.

Slurry Wall and Cover System for Redevelopment of the McColl Superfund Site

2026-06-16T14:30:11-06:00October 28th, 2009|Tags: , , , , |

The McColl Superfund site is a 20-acre former industrial waste disposal facility. From 1942 to 1946, petroleum sludges and other wastes from the production of high octane aviation fuel were placed in 12 unlined pits. In the 1950s, in an effort to control odors and gaseous emissions from the site, several of the pits were covered with diesel oil-based drilling mud. The site was placed on the National Priorities, or Superfund, List in 1982. In 1984, under a CERCLA Unilateral Administrative Order (UAO), the U.S. EPA directed the Potentially Responsible Parties (PRPs) to implement a remedy consisting of excavation and off-site disposal of hazardous wastes that was estimated to cost in excess of $200 million. New residential development and a golf course surrounding the site complicated the remediation, and tarry seeps and malodorous emissions were emanating from the site.

Forensic Analysis of Subsurface Vapor Intrusion to Indoor Air and Background Conditions at a Former MGP Site in New Jersey

2026-04-02T15:50:26-06:00October 28th, 2009|Tags: , |

A former manufactured gas plant (MGP) site was redeveloped into a multi-unit commercial plaza, and an assessment of the potential for subsurface vapor intrusion to indoor air was required to comply with new Guidance from the New Jersey Department of Environmental Protection (NJDEP). The various businesses located with the commercial plaza included a hardware store, restaurant, and beauty salon, all of which were expected to have interior sources of various chemical vapors. In addition, outdoor air in parts of New Jersey occasionally exceeds the target concentrations for benzene, which is an expected constituent of MGP wastes. In order to comply with the NJDEP Guidance, without erroneously attributing background contributions to subsurface vapor sources, Geosyntec designed an investigative program and conducted forensic analysis of the data to distinguish the relative contributions of subsurface, interior and outdoor sources to indoor air vapor concentrations.

Private and Municipal Landfill Gas to Energy Opportunity Assessments in South Carolina for Santee Cooper

2026-04-02T15:50:53-06:00October 28th, 2009|Tags: , |

Santee Cooper, a leading supplier of electricity in South Carolina, established a "green power" generation portfolio goal of 54 MW of electricity from operating landfill gas to energy (LFGE) projects. The process involves identifying, quantifying, qualifying, and securing a contract for the gas source, and then constructing the generation equipment and connection to the power grid.

Municipal Solid Waste Relocation and Disposal Capacity Expansion Using MSE Wall Technology at Crossroads Landfill

2026-04-02T15:50:54-06:00October 28th, 2009|Tags: , , |

The Crossroads Landfill has been in operation since 1976 to serve the waste disposal needs of Maine residents and businesses. Waste Management Disposal Services of Maine (WMDSM) acquired the facility in 1990. Through a series of Maine Department of Environmental Protection (MDEP) permits, WMDSM has expanded the facility to cover approximately one half of the 897-acre site. With the continuing demand for residential and commercial waste disposal services throughout New England, WMDSM chose to create additional disposal capacity at the site. They also want to reduce the potential long-term environmental liability associated with more than one million cubic yards of waste in unlined cells that came with the site purchase. WMDSM selected Geosyntec to provide engineering, permitting, and construction quality assurance services for the phase expansion of the facility.

Engineering Analyses and Design Innovations Extend Outer Loop Landfill Operating Life

2026-04-02T15:51:22-06:00October 28th, 2009|Tags: , , |

Waste Management of Kentucky, LLC (WMK) owns and operates the Outer Loop Recycling and Disposal Facility in Louisville, Kentucky. The facility primarily serves the Louisville metropolitan area, and is the largest municipal solid waste landfill in Kentucky, based on both tonnage and total disposal capacity. The existing conditions at the 780-acre site prior to Geosyntec's involvement included seven physically-distinct individual waste disposal units (some lined, others unlined).

Environmental Monitoring, GCCS and PCS Optimization, and LFGTE/Green Power Project Support at Seminole Road Landfill

2026-04-02T15:51:22-06:00October 28th, 2009|Tags: , |

DeKalb County, Georgia, part of the urban core of metropolitan Atlanta, owns and operates the Seminole Road Landfill which has been accepting municipal solid waste since the 1970s. In accordance with Georgia Environmental Protection Division (EPD) regulations, the County has been conducting groundwater, surface water, and methane monitoring at the landfill.

Innovative Remedy Application for Groundwater Treatment at Somersworth NPL Site

2026-04-02T15:51:22-06:00October 28th, 2009|Tags: , , , |

The City of Somersworth, New Hampshire, operated a disposal site on a 26-acre property from the mid-1930s until 1981. Originally, the City burned residential, commercial, and industrial wastes at the site. In 1958, the dump was converted to a landfill. While it was in operation, unknown quantities of sludges, solvents, acids, dyes, metals, laboratory or pharmaceutical wastes, and potash were disposed of at the site.