Decommissioning and Demolition Plans and Mercury Containment Removal at a Former Chlor-alkali Manufacturing Plant

2026-07-20T08:34:55-06:00July 20th, 2026|

The LCP Holtrachem Site is a former chlor-alkali manufacturing facility which used the mercury cell process, located along the Cape Fear River near the coast of North Carolina. This ecologically sensitive area serves as a fishery, fisheries nursery area, and spawning area for the endangered short nosed sturgeon.

Site Investigation and Remediation of NAPL and Sampling and Analysis Plan Development for a Former Creosote Storage Facility

2026-07-20T08:09:54-06:00July 20th, 2026|

The Bernuth-Lembcke site is a 3.5-acre parcel of land situated in an industrial setting near the Savannah River in Savannah, Georgia. The site PRPs include Norfolk Southern Railway (NS) and Honeywell.

CAP Approach to Site and Stream Remediation and Reduction of Hydrocarbons in Fractured Bedrock Aquifer at a Former Manufactured Gas Plant

2026-07-20T07:40:35-06:00July 20th, 2026|

At the Colonial Pipeline Gaffney booster station site, the overburden and bedrock aquifers beneath the site have been impacted with dissolved petroleum hydrocarbons associated with historical operations and spills at the facility. A methyl tertiary butyl ether (MTBE) and benzene plume had migrated to both the north and the south part of the site because of the groundwater divide near the spill area.

Greenhouse Gas Emission Offset Evaluation and Trading at a Town-owned Landfill

2026-06-16T14:29:57-06:00March 23rd, 2026|Tags: , |

The County of Santa Barbara in southern California needed to enhance its available data resources with which to manage its stormwater runoff water quality. The County felt that there were significant gaps in existing data that it needed to make long-range planning decisions.In particular, there were significant data gaps in their GIS system, such as detailed estimates of impervious cover, recent high quality multi-spectral orthophotography, etc. These data were needed in order to facilitate the implementation of stormwater best management practices, or BMPs. Ultimately, with limited funds with which to implement BMPs, the County's goal was to prioritize which areas needed attention first in terms of retrofits, new nonpoint source water quality control, etc.

Multimodal Facility Waterfront Bank Stabilization

2026-05-15T15:03:00-06:00March 19th, 2026|

In 2016, five areas of significant bank erosion were discovered near the Merrimack Valley Regional Transit Authority (MVRTA) operating facility. The erosion spanned approximately 500 linear feet of shoreline of the tidally influenced Merrimack River and damaged several stormwater outfalls, a retaining wall, and the foundations of two MVRTA buildings.

Dam Seismic Hazard and Embankment Response

2026-04-06T13:32:05-06:00March 17th, 2026|

This earth-rock dam, including embankment and powerhouse facilities, was constructed between 1923 and 1925. The dam impounds a 3,600-acre lake, which is the largest freshwater lake in a state in Northeast United States. For seepage control, the dam contains a thin-section concrete core wall beneath the upstream portion of the crest. The embankment, which has a maximum height of 86 feet and length of approximately 1,300 feet, was constructed using the semi-hydraulic fill method whereby earthen materials were dumped on either side of the core wall and then sluiced towards the core. The dam is State-regulated and is classified as a high-hazard structure.

Mule Creek Dam Reservoir Inundation Mapping

2026-04-06T13:31:30-06:00March 17th, 2026|Tags: , , |

Mule Dam is located near the city of Ione, in Amador County, California. The 540 acre-feet reservoir holds treated effluent from nearby Mule Creek State Prison (MCSP). Classified as a high-hazard potential dam (HHPD) by the California Division of Safety of Dams (DSOD), the failure of this structure would likely cause significant damage and loss of human life. The project's objective was to evaluate the impacts of a potential breach. Information from the study was used to update the dam's Emergency Action Plan (EAP).

LA County Metropolitan Transportation Authority

2026-04-02T15:56:46-06:00March 17th, 2026|

The LA County Metropolitan Transportation Authority (Metro) requested sustainability engineering services for water resources, conservation and compliance. Under legal obligations Metro is required to track, implement, and report on the following categories: climate change & resiliency, energy, solid waste & recycling, and water.  In order to maintain compliance in daily operations and capital projects, Geosyntec is tasked with providing research, analysis, planning, project development, and engineering services relating to the full life cycle of Metro's water sustainability and compliance programs.

Environmental and Management System Support, Multiple Locations in the United States

2026-04-06T13:26:41-06:00March 17th, 2026|

Arch Resources (Arch) is a leading U.S. producer of metallurgical products for the global steel industry, and the leading supplier of premium High-Vol A metallurgical coal globally. Arch and its subsidiaries operate four large, modern metallurgical mines that consistently set the industry standard for both mine safety and environmental stewardship. The flagship Leer mine consistently ranks among the lowest cost U.S. metallurgical mines and produces a product quality that is recognized and sought-after worldwide. Leer operations are complemented by the Leer South, Beckley and Mountain Laurel mines, which in aggregate provide Arch with a full suite of high-quality metallurgical products for sale into the global metallurgical market. Arch and its subsidiaries also operate highly efficient, low-cost thermal mines in the Powder River Basin in Montana and Wyoming, and in Colorado. These mines produce highly cost-competitive thermal coal for sale into the domestic and international power generation markets.

Confidential Investor Due Diligence for Data Center Power Plant

2026-04-07T09:04:31-06:00January 9th, 2026|

In support of the rapid expansion of American digital and energy infrastructure, an investor sought expert guidance before acquiring a combined cycle gas turbine power plant. Recognizing the complexity and significance of the transaction, the investor engaged Geosyntec to conduct a comprehensive technical due diligence review, focusing on environmental, health, and safety and sustainability risks.