U.S. Army Fort Shafter Flats Flood Mitigation, Honolulu

2026-04-02T12:13:39-06:00April 12th, 2022|Tags: , |

The U.S. Army Fort Shafter Flood Mitigation Project involves a 1,700 linear-foot levee wall, high-capacity flood control pumps, and a modified bridge opening to increase flow capacity. The project objective was to protect a 30-acre, highly used section of the Fort Shafter Flats area.