U.S. Army Fort Shafter Flats Flood Mitigation, Honolulu
The U.S. Army Fort Shafter Flood Mitigation Project involves a 1,700 linear-foot levee wall, high-capacity flood control pumps, and a modified bridge opening to increase flow capacity. The project objective was to protect a 30-acre, highly used section of the Fort Shafter Flats area.


