Bridging the Gap Between Construction and Design
Industrial and heavy-civil clients must navigate ever-widening gaps between design and construction that can cause slow-downs, unforeseen expenditures, and delayed timelines. These complexities often appear during environmental remediation and demolition, as well as during construction of large buildings and public assemblies; airports; sports complexes; and energy, utility and linear transportation projects.
Geosyntec's construction engineering practitioners excel at providing constructability- and risk-centered engineering and consulting services in geostructural, geotechnical, and geoenvironmental design for temporary and permanent components of construction and demolition.
Our hybrid backgrounds as engineers and constructors allow us to provide value-added services in construction management (preconstruction, procurement, and execution), design management, technical and constructability reviews, and peer review processes.
Clients seek out our expertise with various project-delivery methods, including design-bid-build, construction management at risk, and design-build. In addition, we are adept at supporting the unique variety of project-delivery methods seen in public-private partnership projects.
Our breadth of experience and knowledge allows Geosyntec to present our clients with opportunities to close the gaps in construction and engineering practice integration and realize improvements in cost, schedule, and constructability.